BMW M2 2021 Black Automatic 3 L WBS2U7C07M7H62252
-
Auction:
Copart Auto Auction
- Lot Number: 43778273
- Winning bid: 32 750 $
- Prebid: 30 750 $
- Date Sale: 20.04.2023
- Status: Sold
- Date Updated: 15.05.2023
-
VIN:
WBS2U7C07M7H62252
- Year: 2021
- Condition: Run & Drive Verified
- Mileage: 9 203 km
- Transmission: Automatic
- Color: Black
- Primary Damage: Side
- Secondary Damage: Front
- Drive: Rear Wheel Drive
- Fuel: Gasoline
- Sale type: Pure Sale
- Documents: TX - SV
- Keys Present: No
- Cylinders: 6
- Trim: COMPETITION
- Grid/Row: V030
- Retail Price: 60892
The BMW M2: A High-Performance Sports Coupe
The BMW M2 is a compact sports coupe that has been designed for driving enthusiasts who want a balance of power and agility in a compact package. With its sleek and aerodynamic design, powerful engine, and advanced technology, the M2 is the perfect car for anyone who wants the ultimate driving experience.
Powerful Engine
Under the hood of the BMW M2 is a turbocharged 3.0-liter inline-six engine that delivers 365 horsepower and 343 lb-ft of torque. This power is sent to the rear wheels through a seven-speed dual-clutch automatic transmission or a six-speed manual, depending on the model, allowing the M2 to go from 0 to 60 miles per hour in just 4.2 seconds. The engine is incredibly responsive, with smooth and linear power delivery that makes the M2 a joy to drive.
Agile Handling
The BMW M2 is not only powerful, but also incredibly agile, with precise and responsive handling that makes it a blast to drive on winding roads. The car features an M-tuned suspension that is designed to provide a balance of comfort and performance, as well as a variable sport steering system that gives the driver a precise and natural feel for the road. Additionally, the M2 comes equipped with advanced safety features such as traction control, stability control, and automatic emergency braking, making it a safe and reliable choice for driving enthusiasts.
Stylish Design
In addition to its impressive performance and technology, the BMW M2 also boasts a stylish and aerodynamic design that is sure to turn heads wherever you go. The car features a bold and aggressive front grille, sharp and angular lines, and a wide and low stance that gives it a powerful and athletic look. The interior of the M2 is equally impressive, with high-quality materials, comfortable seats, and a user-friendly infotainment system that makes it easy to stay connected and entertained on the road.
Overall, the BMW M2 is an exceptional sports coupe that combines power, agility, and style in one package. Whether you're looking for a car to take on the track or just want a fast and stylish ride for everyday use, the BMW M2 is an excellent choice that is sure to exceed your expectations.
Moonroof
19" M Forged Black Y-Spoke Wheels W/Mixed Performance Tires
M Double-Clutch Transmission W/Drivelogic
Executive Package
M Driver's Package
Black Dakota W/Blue Stitching
Black Dakota W/Orange Stitching
Hockenheim Silver Metallic
Long Beach Blue Metallic
Black Sapphire Metallic
Alpine White
Sunset Orange Metallic
Carbon Fiber
Black High-Gloss W/Pearl Chrome Accent