Bidinfo APP

BMW M2 2019 Orange UNKNOWN 3 L WBS2U7C58KVB09353

WBS2U7C58KVB09353 Photo# 1 WBS2U7C58KVB09353 Photo# 2 WBS2U7C58KVB09353 Photo# 3 WBS2U7C58KVB09353 Photo# 4 WBS2U7C58KVB09353 Photo# 5 WBS2U7C58KVB09353 Photo# 6 WBS2U7C58KVB09353 Photo# 7 WBS2U7C58KVB09353 Photo# 8 WBS2U7C58KVB09353 Photo# 9 WBS2U7C58KVB09353 Photo# 10
Winning bid: $ 35 025
Are you an owner?
  • Auction: IAAI Auction IAA Auction
  • Lot Number: 37059356
  • Winning bid: 35 025 $
  • Prebid: 17 525 $
  • Date Sale: 14.09.2023
  • Status: Sold
  • Date Updated: 14.09.2023
  • VIN:

    WBS2U7C58KVB09353

  • Year: 2019
  • Condition: Vehicle Starts
  • Mileage: 19 479 km
  • Transmission: UNKNOWN
  • Body: Coupe
  • Color: Orange
  • Primary Damage: Right Side
  • Secondary Damage: Suspension
  • Drive: Rear Wheel Drive
  • Fuel: Gasoline
  • Airbag State: Intact
  • Seller: State Farm Group Insurance
  • Cylinders: 6
  • Loss Type: Collision
  • Restraint System: Driver Air Bag; Passenger Air Bag
  • Actual Cash Value: $ 58 340
  • Actual Odometer: Yes
  • Keys: Yes
Engine Information
Compression ratio: 10.2 kg/cm2
Number of cylinders: 6
Displacement: 2979 cc
Configuration: Inline
Horsepower: 405 HP
Torque: 406
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 25 mpg
City: 18 mpg

Sales statistics


The BMW M2: A High-Performance Sports Coupe


The BMW M2 is a compact sports coupe that has been designed for driving enthusiasts who want a balance of power and agility in a compact package. With its sleek and aerodynamic design, powerful engine, and advanced technology, the M2 is the perfect car for anyone who wants the ultimate driving experience.

Powerful Engine

Under the hood of the BMW M2 is a turbocharged 3.0-liter inline-six engine that delivers 365 horsepower and 343 lb-ft of torque. This power is sent to the rear wheels through a seven-speed dual-clutch automatic transmission or a six-speed manual, depending on the model, allowing the M2 to go from 0 to 60 miles per hour in just 4.2 seconds. The engine is incredibly responsive, with smooth and linear power delivery that makes the M2 a joy to drive.

Agile Handling

The BMW M2 is not only powerful, but also incredibly agile, with precise and responsive handling that makes it a blast to drive on winding roads. The car features an M-tuned suspension that is designed to provide a balance of comfort and performance, as well as a variable sport steering system that gives the driver a precise and natural feel for the road. Additionally, the M2 comes equipped with advanced safety features such as traction control, stability control, and automatic emergency braking, making it a safe and reliable choice for driving enthusiasts.

Stylish Design

In addition to its impressive performance and technology, the BMW M2 also boasts a stylish and aerodynamic design that is sure to turn heads wherever you go. The car features a bold and aggressive front grille, sharp and angular lines, and a wide and low stance that gives it a powerful and athletic look. The interior of the M2 is equally impressive, with high-quality materials, comfortable seats, and a user-friendly infotainment system that makes it easy to stay connected and entertained on the road.

Overall, the BMW M2 is an exceptional sports coupe that combines power, agility, and style in one package. Whether you're looking for a car to take on the track or just want a fast and stylish ride for everyday use, the BMW M2 is an excellent choice that is sure to exceed your expectations.

Available Vehicle Options
Exterior

19" M Forged Black Y-Spoke Wheels W/Mixed Performance Tires

19" x 9.0" front and 19" x 10.0" rear Y-Spoke (style 788 M) Black painted forged alloy wheels with 245/35R19 front and 265/35R19 rear performance tires

Moonroof

Power glass moonroof with one-touch and tilt/slide functions; Wind deflector
Mechanical

M Double-Clutch Transmission W/Drivelogic

7-speed double clutch automated manual transmission with Drivelogic
Package

Executive Package

Heated steering wheel; Adaptive full LED headlights, which include LED high- and low- beam adaptive headlights and LED Corona rings (lights that encircle each headlight); Automatic high beams; Wireless charging; WiFi Hotspot; Speed limit info

M Driver's Package

One-day high performance driving school for BMW M vehicles, taught on a racetrack either at the BMW Performance Center East in South Carolina or West in California; Increased vehicle top speed limiter. New owner uses his or her own new M vehicle for this event.
Available Vehicle Colors
Interior

Black Dakota W/Blue Stitching

Black Dakota W/Orange Stitching

Exterior

Hockenheim Silver Metallic

Alpine White

Sunset Orange Metallic

Long Beach Blue Metallic

Black Sapphire Metallic

Interior Trim

Black High-Gloss W/Pearl Chrome Accent

Carbon Fiber

Lot description
It has already become popular and everyone knows, there are many used and new car auctions in the North America. In this case, the Iaai auction site put up for sale 2019 BMW M2 with a 3L engine. The auto was sold with minor damage which you can see in the photos. In order for the information to be open we published the VIN Code number of the car WBS2U7C58KVB09353. Buying an auto from the Iaai auction site is a very profitable choice, because you can buy a vehicle for 44% of its price, thereby saving on the acquisition and making a money on it if you want. This car is a good example of such a case, because after minor repairs you can drive a good car at a reduced price. If you want to buy a good car from the USA or Canada then most likely you can think about to make an analysis of the available options and check for what price they are sold and in what condition. You can check it at this website because there few companies who give full info so easy and useful without any additional fees. For you we made search for a car by vincode number on the website, as well as select a specific make and model to accurately search for the car you need. Today we will teach you how to research amazing sedan from a Insurance Auto Auction. At first, it’s better to examine the car pictures rigth thoroughly and assess the damage to the car. Read the lot notes, category of damage, car mileage and compare them with the vehicle images. Pay attention to the car paint, the condition of the roof, marks from the Insurance Auto Auction staff and the general condition of the vehicle. If it has a lot of problems then we propose that you contact the experts so that they evaluate the problems and tell you the real estimated cost and time of vehicle repair. We propose that you choose car with little problems resulting from minor accidents or weather conditions, as in this case your auto will be good.