Bidinfo APP

BMW M3 2021 Blue Automatic 3 L WBS33AY03MFL21444

WBS33AY03MFL21444 Photo# 1 WBS33AY03MFL21444 Photo# 2 WBS33AY03MFL21444 Photo# 3 WBS33AY03MFL21444 Photo# 4 WBS33AY03MFL21444 Photo# 5 WBS33AY03MFL21444 Photo# 6 WBS33AY03MFL21444 Photo# 7 WBS33AY03MFL21444 Photo# 8 WBS33AY03MFL21444 Photo# 9 WBS33AY03MFL21444 Photo# 10 WBS33AY03MFL21444 Photo# 11 WBS33AY03MFL21444 Photo# 12
Winning bid: $ 22 600
Are you an owner?
  • Auction: Copart Auto Auction Copart Auto Auction
  • Lot Number: 48661404
  • Winning bid: 22 600 $
  • Prebid: 20 800 $
  • Date Sale: 14.05.2024
  • Status: Sold
  • Date Updated: 14.05.2024
  • VIN:

    WBS33AY03MFL21444

  • Year: 2021
  • Mileage: 26 625 km
  • Transmission: Automatic
  • Color: Blue
  • Primary Damage: Side
  • Secondary Damage: Roof
  • Drive: Rear Wheel Drive
  • Fuel: Gasoline
  • Sale type: On Minimum Bid
  • Documents: PA - SC
  • Keys Present: No
  • Cylinders: 6
  • Trim: COMPETITION
  • Grid/Row: H020
  • Retail Price: 70582
Engine Information
Compression ratio: 9.3 kg/cm2
Number of cylinders: 6
Displacement: 2993 cc
Configuration: Inline
Horsepower: 503 HP
Torque: 479
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 23 mpg
City: 16 mpg

Sales statistics


The BMW M3: A High-Performance Sports Sedan


The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.

Exterior Design

The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.

Interior Comfort and Technology

The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.

Performance and Handling

Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.

In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.

Available Vehicle Options
Interior

Front Ventilated Seats

M Drive Professional

Intended specifically for use in a controlled environment, such as a car racing track, M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.

M Carbon Bucket Seats

Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats
Exterior

Carbon Fiber Exterior Package

Inlays in the front air intakes, rear diffuser and exterior mirror caps; Carbon fiber reinforced plastic (CFRP) rear spoiler

Moonroof

Power glass moonroof with 1-touch tilt/slide function; Wind deflector that deploys when the moonroof is slid open; The remainder of the roof is body colored metal, replacing the standard equipment Dark Grey carbon fiber reinforced plastic (CFRP) roof.

Individual Shadowline Lights

Black inlay trim within the headlight assemblies

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Bi-Color alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

M Compound Brakes W/Black Calipers

19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Black painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

18"/19" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

18" x 9.5" front and 19" x 10.5" rear M Double-Spoke (style 824M) Orbit Grey painted alloy wheels with 275/40R18 front and 285/35R19 rear non run-flat performance tires

M Compound Brakes W/Red Calipers

19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Orbit Grey alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Extended Shadowline Trim Deletion

Body colored mirror caps and rear spoiler; Bright finish tailpipe finishers
Mechanical

M Carbon Ceramic Brakes

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers
Package

Parking Assistance Package

Parking Assistant Plus, which, when engaged, surveys the size of available nearby parallel and perpendicular parking spaces to determine which ones are of adequate size for the M3. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will maneuver the car into that space.; Surround View with 3D View, which, during parking maneuvers, displays real time images of the view around the car onto the screen located on the upper, center part of the dashboard.; Drive Recorder, which is capable of recording video of the vehicle's surroundings and having the captured video played back on the screen located on the upper, center part of the dashboard.

Executive Package

Remote engine start; Heated steering wheel; Power trunk open/close; Icon Adaptive LED headlights with Laserlight; Head-up display, which projects images of select travel information, such as vehicle speed and navigation instructions, in front of the driver in a visual field that is beyond the windshield; Wireless charging; Gesture control; WiFi hotspot with complimentary 3-month or 3GB trial

Driving Assistance Professional Package

Extended Traffic Jam Assistant (for limited access highways), which is a partially automated driving support function; Active Driving Assistant Pro (Active Cruise Control with stop and go functions, Active Lane Keeping Assistant with side collision avoidance, Steering and Traffic Jam Assistant, Automatic Lane Change, Evasion Assistant and Cross-traffic Alert for the front of the car)

M Driver's Package

This is a 1-day high performance driving class created specifically for BMW M vehicles. The class includes hands-on performance driving training in a controlled environment.
Available Vehicle Colors
Interior

Silverstone/Black Extended Merino

Black Full Merino

Silverstone/Black Full Merino

Black Extended Merino

Kyalami Orange/Black Full Merino

Yas Marina Blue/Black Full Merino W/Yellow Accent

Kyalami Orange/Black Extended Merino

Yas Marina Blue/Black Extended Merino W/Yellow Accent

Exterior

Sao Paulo Yellow

Black Sapphire Metallic

Oxide Grey Metallic

Alpine White

Frozen Brilliant White Metallic

Toronto Red Metallic

Brooklyn Grey Metallic

Frozen Portimao Blue Metallic

(Ind) Dravit Grey Metallic

Tanzanite Blue II Metallic

Portimao Blue Metallic

Isle Of Man Green Metallic

Interior Trim

Carbon Fiber

BMW Individual Finishers Aluminum Fabric High-Gloss

Aluminum Tetragon

Individual Piano Black Finish

BMW Individual 'Fineline' Black Silver Effect Open-Pored

Lot description
As people know, there are many famous vehicle auctions in the United States of America. Not so long ago the Copart car auction sold a 2021 BMW M3 with a 3L engine. The car was up for sale with damage which you can see in the photos. In order for the information to be open we post the vincode of the car WBS33AY03MFL21444. Selection an auto from the Copart auto auction site is a very profitable choice, because you can win an auto for 42% of its price, thereby save your money if you wish. This car is a excellent example of a similar solution, because after normal repairs you can drive a nice car at a great price. If you want to buy a good car from the USA or Canada usually you first need to make an analysis of the best options and check for what price they are sold and in what condition. You can check it at this website because there few companies who publish free data so clear and transparent without any additional fees. For you we made search for a car by VIN number on the site, as well as select a specific make and model to accurately check for the car you need. Now I think it’s good to say you hot to find amazing vehicle from a USA car auction. For start, it’s better to look auto vincode images rigth thoroughly and assess the damage to the car. Read the annotation, type of damage, car odometer and compare them with the lot images. Pay attention to the paintwork, the condition of the roof, marks from the Insurance Auto Auction staff and the general condition of the vehicle. If vehicle has a lot of damage then we suggest that you contact the mechanic so that they evaluate the damage and tell you the real estimated cost and time of vehicle repair. We suggest that you choose car with small problems resulting from minor accidents or weather conditions, as in this case your car will be as safe after repair as before.