Bidinfo APP

BMW M3 2015 White Automatic 3 L WBS3C9C52FP803613

WBS3C9C52FP803613 Photo# 1 WBS3C9C52FP803613 Photo# 2 WBS3C9C52FP803613 Photo# 3 WBS3C9C52FP803613 Photo# 4 WBS3C9C52FP803613 Photo# 5 WBS3C9C52FP803613 Photo# 6 WBS3C9C52FP803613 Photo# 7 WBS3C9C52FP803613 Photo# 8 WBS3C9C52FP803613 Photo# 9 WBS3C9C52FP803613 Photo# 10 WBS3C9C52FP803613 Photo# 11 WBS3C9C52FP803613 Photo# 12
Last bid: $ 12 100
Are you an owner?
Engine Information
Compression ratio: 10.2 kg/cm2
Number of cylinders: 6
Displacement: 2979 cc
Configuration: Inline
Horsepower: 425 HP
Torque: 406
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 26 mpg
City: 17 mpg

The BMW M3: A High-Performance Sports Sedan


The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.

Exterior Design

The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.

Interior Comfort and Technology

The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.

Performance and Handling

Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.

In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.

Available Vehicle Options
Interior

Enhanced USB And Bluetooth Plus Smartphone Integration

Harman Kardon Surround Sound System

Harman Kardon surround sound system with vehicle-specific equalization; 600-watt amplifier; 16 speakers (7 tweeters, 7 midrange and 2 bass)

Side And Top View Cameras

Cameras on the exterior of the vehicle are positioned in such a way as to display the areas behind and on either side of the vehicle, shown on the display mounted in the center of the dashboard.

Concierge Services

Personalized services such as dining and hotel recommendations provided along with directions and addresses. Addresses can be sent to your car and transferred to the navigation system. This service is available 24 hours a day, 7 days a week.

Power Rear Sunshade

Power rear window sunshade; Manual rear side window shades
Exterior

19" Black Double-Spoke Light Alloy Wheels W/Mixed Performance Tires

19" x 9.0" front and 19" x 10.0" rear Double-Spoke (style 437 M) Black painted forged alloy wheels with 255/35R19 front and 275/35R19 rear performance tires

Moonroof

Power glass moonroof with one-touch and tilt/slide functions and wind deflector. The standard equipment carbon fiber roof will replaced with a steel roof.

19" Double-Spoke Light Alloy Wheels W/Mixed Performance Tires

19" x 9.0" front and 19" x 10.0" rear Double-Spoke (style 437 M) Ferric Gray forged alloy wheels with 255/35R19 front and 275/35R19 rear performance tires
Mechanical

Adaptive M Suspension

Active suspension which automatically adjusts damping to adapt to changing road conditions and different driving styles

M Double-Clutch Transmission W/Drivelogic

7-speed double clutch automated manual transmission with Drivelogic

M Carbon Ceramic Brakes

Package

Executive Package

Heated steering wheel; Comfort Access keyless entry; Rear view camera; Heated rear seats (only included when the Executive Package is ordered in combination with either the Extended Merino leather or Full Merino leather upholsteries); Reatractable headlight washers; Park Distance Control (front and rear); Head-up display; SiriusXM satellite radio with 1 year subscription; Cloth/leather combination Carbonstructure Anthracite/Black upholstery

Driver Assistance Plus

Active Blind Spot Detection, which, when the turn signal is activated, monitors the blind spot on the side of the vehicle with the active turn signal. A visual signal on the relevant exterior mirror housing warns the driver of the presence of a vehicle in the blind spot or alerts the driver of a vehicle that is rapidly approaching the blind spot.; Active Driving Assistant, which includes Lane Departure (this driver-activated feature senses any course deviations the car makes at highway speeds when the turn signal is not used, and if such a deviation is identified, the driver is alerted with a vibration sent through the steering wheel), Forward Collision Warning, Pedestrian Warning and City Collision Mitigation; Side and Top View Cameras; Speed Limit Info

Lighting Package

LED high- and low- beam adaptive headlights; LED Corona rings (lights that encircle each headlight); LED cornering lights; LED turn signals; Automatic High Beams, which monitor oncoming vehicles and ambient light levels and turn the high beams on and off, based on those factors
Safety

Parking Assistant

When engaged, Parking Assistant surveys the size of available nearby parking spaces to determine which ones are of adequate size for the M3. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will provide all steering inputs required to maneuver the car into that space. In a combined effort with Parking Assistant, the driver must select the appropriate gear and control the accelerator and brakes to park the car.
Available Vehicle Colors
Interior

Combination Carbonstructure Anthracite/Black

Silverstone Extended Merino

Silverstone Full Merino

Black Extended Merino

Sonoma Beige Extended Merino

Sakhir Orange/Black Extended Merino

Sonoma Beige Full Merino

Sakhir Orange/Black Full Merino

Black Full Merino

Exterior

Mineral Grey Metallic

Austin Yellow Metallic

Yas Marina Blue Metallic

Black Sapphire Metallic

Sakhir Orange Metallic

Mineral White Metallic

Silverstone Metallic

Alpine White

Interior Trim

Anthracite Wood W/Pearl Gloss Chrome Highlight Trim Finishers

Aluminum Blade W/Black Chrome Highlight Trim Finishers

Carbon Fiber

Lot description
It's not a secret for anyone, there are some popular vehicle auctions in the USA. Not so long ago the Copart auction site put up for sale 2015 BMW M3 with a 3L engine. The car was sold with damage which can check in the photos. To make everything clear we post the Vin-number of the car WBS3C9C52FP803613. Selection a vehicle from the Copart auction site is a very good investment, because you can win an auto for 42% of its price, thereby save your money and take good car if you wish. This car is a excellent example of a similar solution, because after normal repairs you can drive a good car at a reduced price. If you need to buy a nice vehicle from United States usually you first need to make an analysis of the best options and check for what price they are sold and in what condition. You can do this with convenience on our website, because we are one of the few who publish free data so clear and transparent without hide payments. You may use the search for a car by vincode number on the site, as well as select a specific make and model to accurately search for the car you need. Today I think it’s good to tell you how to research amazing auto at the Impact. For best research, you may to examine vehicle pictures rigth conscientiously and assess the damage to the car. Read the car info, form of damage, car miles and compare them with the car images. Check the car paint, the condition of the roof, marks from the IAAI staff and the general condition of the car. If it has a lot of damage then we recommend that you contact the experts so that they check the damage and say you the real estimated price of car repair. We propose that you choose vehicles with minimal damage resulting from minor accidents or weather conditions, as in this case your car will be amazing.