Bidinfo APP

BMW M3 2024 Black Mechanical 3 L WBS53AY06RFS67301

WBS53AY06RFS67301 Photo# 1 WBS53AY06RFS67301 Photo# 2 WBS53AY06RFS67301 Photo# 3 WBS53AY06RFS67301 Photo# 4 WBS53AY06RFS67301 Photo# 5 WBS53AY06RFS67301 Photo# 6 WBS53AY06RFS67301 Photo# 7 WBS53AY06RFS67301 Photo# 8 WBS53AY06RFS67301 Photo# 9 WBS53AY06RFS67301 Photo# 10 WBS53AY06RFS67301 Photo# 11 WBS53AY06RFS67301 Photo# 12
Last bid: $ 11 300
Are you an owner?
Engine Information
Compression ratio: 9.3 kg/cm2
Number of cylinders: 6
Displacement: 2993 cc
Configuration: Inline
Horsepower: 473 HP
Torque: 406
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 23 mpg
City: 16 mpg

Sales statistics


The BMW M3: A High-Performance Sports Sedan


The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.

Exterior Design

The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.

Interior Comfort and Technology

The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.

Performance and Handling

Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.

In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.

Available Vehicle Options
Interior

Front Ventilated Seats

M Carbon Bucket Seats

Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats

M Drive Professional

Intended specifically for use in a controlled environment, such as a car racing track, M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.

Drive Recorder

Exterior

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Bi-Color painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Moonroof

Power glass moonroof with 1-touch tilt/slide function; Wind deflector that deploys when the moonroof is slid open; The remainder of the roof is body colored metal, replacing the standard equipment Dark Grey carbon fiber reinforced plastic (CFRP) roof.

M Compound Brakes W/Black Calipers

19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Black painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

M Shadowline Lights

Black inlay trim within the headlight assemblies

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Bi-Color painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Icon Adaptive LED Headlights W/Laserlight

Extended Shadowline Trim

High-gloss Black Mirror caps and rear spoiler; Black Chrome tailpipe finishers

M Carbon Exterior Package

Inlays in the front air intakes and rear diffuser; M Carbon exterior mirror caps; M Carbon rear spoiler

M Compound Brakes W/Red Calipers

19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Orbit Grey painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires
Mechanical

M Carbon Ceramic Brakes

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers
Package

Driving Assistance Professional Package

Extended Traffic Jam Assistant (for limited access highways), which is a partially automated driving support that functions at speeds up to 40 mph; Active Driving Assistant Pro (Active Cruise Control with stop and go functions, Active Lane Keeping Assistant with side collision avoidance, Steering and Traffic Jam Assistant and Automatic Lane Change, Evasion Assistant)

M Driver's Package

This is a 1-day high performance driving class created specifically for BMW M vehicles. The class includes hands-on performance driving training in a controlled environment. The vehicle's top speed limiter will be increased as well.

Parking Assistance Package

Parking Assistant Plus, which, when engaged, surveys the size of available nearby parallel and perpendicular parking spaces to determine which ones are of adequate size for the M3. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will maneuver the car into that space.; Surround View with 3D View, which, during parking maneuvers, displays real time images of the view around the car onto the central information display screen on the dashboard.

Executive Package

Heated steering wheel; Power trunk open/close; SensaTec (leatherette material) dashboard; BMW Curved Display with head-up display
Available Vehicle Colors
Interior

Fjord Blue/Black Full Merino

Fiona Red/Black Full Merino

Yas Marina Blue/Black Extended Merino W/Yellow Accent

Silverstone/Black Extended Merino

Fiona Red/Black Extended Merino

Fjord Blue/Black Extended Merino

Tartufo Extended Merino

Silverstone/Black Full Merino

Kyalami Orange/Black Full Merino

Tartufo Full Merino

Kyalami Orange/Black Extended Merino

Ivory White Extended Merino

Black Extended Merino

Black Full Merino

Yas Marina Blue/Black Full Merino W/Yellow Accent

Ivory White Full Merino

Exterior

Frozen Portimao Blue Metallic

Sao Paulo Yellow

Aventurin Red Metallic

Isle Of Man Green Metallic

Frozen Pure Grey II Metallic

Tanzanite Blue II Metallic

Black Sapphire Metallic

Dravit Grey Metallic

Alpine White

Toronto Red Metallic

Skyscraper Grey Metallic

Brooklyn Grey Metallic

Special Order Color

Portimao Blue Metallic

Frozen Brilliant White Metallic

Interior Trim

Individual Aluminum

Carbon Fiber

Individual Piano Black Finish

Aluminum Rhrombicle Anthracite

Lot description
It has already become popular and everyone knows, that there are a couple car auctions in the North America. Recently the Copart auction site put up for sale 2024 BMW M3 with a 3L engine. The car was up for sale with minor damage which can check in the photos. In order for the information to be open we published the Vin-number of the car WBS53AY06RFS67301. Buying an auto from the Copart auto auction site is a very profitable investment, because you can buy a vehicle for 44% of its price, thereby save your capital and making good decision if you want. This car is a good example of such a case, because after minor repairs you can drive a good car at a excellent price. If you want to buy a good car from United States of America some times you first need to make an analysis of the nice options and understand for what price they are sold and in what condition. You can do this with convenience on our website, because there few companies who give full info so easy and free without any additional fees. You may use the search for a car by VIN number on the website, as well as select a specific make and model to accurately check for the vehicle you need. Today I want to tell you how to research safe vehicle at the Impact Canadian Auto Auction. For start, it’s better to check auto images rigth scrupulously and assess the damage to the car. Read the car info, classification of damage, car miles and compare them with the car images. Look at the paintwork, the condition of the roof, marks from the Insurance Auto Auction staff and the general condition of the vehicle. If it has a lot of problems then we recommend that you contact the experts so that they evaluate the problems and show you the real estimated cost of vehicle repair. We recommend that you choose vehicles with not a lot of problems resulting from minor accidents or weather conditions, as in this case your car will be as safe after repair as before.