Bidinfo APP

BMW M3 2017 White Automatic 3 L WBS8M9C53H5G84779

WBS8M9C53H5G84779 Photo# 1 WBS8M9C53H5G84779 Photo# 2 WBS8M9C53H5G84779 Photo# 3 WBS8M9C53H5G84779 Photo# 4 WBS8M9C53H5G84779 Photo# 5 WBS8M9C53H5G84779 Photo# 6 WBS8M9C53H5G84779 Photo# 7 WBS8M9C53H5G84779 Photo# 8 WBS8M9C53H5G84779 Photo# 9 WBS8M9C53H5G84779 Photo# 10 WBS8M9C53H5G84779 Photo# 11 WBS8M9C53H5G84779 Photo# 12 WBS8M9C53H5G84779 Photo# 13
Last bid: $ 17 300
Buy now price: $ 24 300
Are you an owner?
Engine Information
Compression ratio: 10.2 kg/cm2
Number of cylinders: 6
Displacement: 2979 cc
Configuration: Inline
Horsepower: 425 HP
Torque: 406
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 26 mpg
City: 17 mpg

Sales statistics


The BMW M3: A High-Performance Sports Sedan


The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.

Exterior Design

The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.

Interior Comfort and Technology

The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.

Performance and Handling

Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.

In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.

Available Vehicle Options
Interior

Apple CarPlay Compatibility

Power Rear Sunshade

Power rear window sunshade; Manual rear side window shades
Exterior

19" Double-Spoke Light Alloy Wheels W/Mixed Performance Tires

19" x 9.0" front and 19" x 10.0" rear Double-Spoke (style 437 M) alloy wheels with 255/35R19 front and 275/35R19 rear performance tires

Moonroof

Power glass moonroof with one-touch and tilt/slide functions and wind deflector. The standard equipment carbon fiber roof will be replaced with a steel roof.

19" Black Double-Spoke Light Alloy Wheels W/Mixed Performance Tires

19" x 9.0" front and 19" x 10.0" rear Double-Spoke (style 437 M) Black painted alloy wheels with 255/35R19 front and 275/35R19 rear performance tires
Mechanical

Standard Suspension

M Carbon Ceramic Brakes

M Double-Clutch Transmission W/Drivelogic

7-speed double clutch automated manual transmission with Drivelogic
Package

Lighting Package

LED high- and low- beam adaptive headlights; LED Corona rings (lights that encircle each headlight); LED cornering lights; LED turn signals; Automatic High Beams, which monitor oncoming vehicles and ambient light levels and turn the high beams on and off, based on those factors

Driver Assistance Plus

Active Blind Spot Detection, which, when the turn signal is activated, monitors the blind spot on the side of the vehicle with the active turn signal. A visual signal on the relevant exterior mirror housing warns the driver of the presence of a vehicle in the blind spot or alerts the driver of a vehicle that is rapidly approaching the blind spot.; Active Driving Assistant, which includes Lane Departure (this driver-activated feature senses any course deviations the car makes at highway speeds when the turn signal is not used, and if such a deviation is identified, the driver is alerted with a vibration sent through the steering wheel), Forward Collision Warning, Pedestrian Warning and City Collision Mitigation; Side and Top View Cameras; Speed Limit Info

Executive Package

Heated steering wheel; Rear view camera; Heated rear seats (only included when the Executive Package is ordered in combination with either the Extended Merino leather or Full Merino leather upholsteries); Retractable headlight washers; Park Distance Control (front and rear); Head-up display; Wireless Charging; Cloth/leather combination Carbonstructure Anthracite/Black upholstery

Competition Package

Increased engine output to 444 horsepower; 20" x 9.0" front and 20" x 10.0" rear Star-Spoke (style 666 M) forged alloy wheels with 265/30R20 front and 285/30R20 rear performance tires; Revised steering ratio; Adaptive M Suspension with revised settings; Different Dynamic Stability Control (DSC) setting; Different setting for the Adaptive M Differential; High-gloss black exterior elements including the twin kidney grille surrounds, body side gills and rear M3 badge; Sport exhaust finished in black chrome; M Sport seats with break-through elements in the seatbacks; Front seatbelts with M stripes on them. Black Full Merino leather seat trim with Silverstone-colored stitching is available upon special request to the Regional Distribution Office.
Safety

Parking Assistant

When engaged, Parking Assistant surveys the size of available nearby parking spaces to determine which ones are of adequate size for the M3. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will provide all steering inputs required to maneuver the car into that space. In a combined effort with Parking Assistant, the driver must select the appropriate gear and control the accelerator and brakes to park the car.

Side And Top View Cameras

Cameras on the exterior of the vehicle are positioned in such a way as to display the areas in front, behind and on either side of the vehicle, shown on the display mounted in the center of the dashboard.
Available Vehicle Colors
Interior

Combination Carbonstructure Anthracite/Black

Cohiba Brown/Black Extended Merino (Individual)

Nutmeg Extended Merino (Individual)

Silverstone Full Merino

Black Extended Merino

Black Full Merino W/Silverstone Stitching

Golden Brown Extended Merino (Individual)

Sonoma Beige Full Merino

Amaro Brown Extended Merino (Individual)

Sakhir Orange/Black Full Merino

Opal White Extended Merino (Individual)

Black Full Merino

Silverstone Extended Merino

Sakhir Orange/Black Extended Merino

Sonoma Beige Extended Merino

Exterior

Alpine White

Azurite Black Metallic

Yas Marina Blue Metallic

Sakhir Orange II Metallic

Champagne Quartz Metallic

Mineral White Metallic

Smoked Topaz Metallic

Austin Yellow Metallic

Tanzanite Blue Metallic

Black Sapphire Metallic

Silverstone Metallic

Mineral Grey Metallic

Interior Trim

Aluminum Blade W/Black Chrome Highlight

Dark Red Sycamore Wood

White Ash Grain Wood

Piano Finish Black

Fineline Anthracite W/Pearl Gloss Chrome Highlight

Carbon Fiber W/Black Chrome Highlight

Lot description
As people know, there are many used and new auto auctions in the United States of America. In this case, the Copart car auction put up for sale 2017 BMW M3 with a 3L engine. The car was up for sale with minor damage which you can see in the photos. In order for the information to be open we post the VIN Code number of the car WBS8M9C53H5G84779. Selection a car from the Copart auto auction site is a very good investment, because you can win a car for 47% of its price, thereby save your capital and making good decision if you want. This car is a excellent example of a similar solution, because after minor repairs you can drive a beautiful car at a excellent price. If you plan to buy a nice vehicle from the USA or Canada then most likely you can think about to make an analysis of the available options and understand for what price they are sold and in what condition. You can do this with convenience on our website, because there few companies who provide such information so clear and transparent without hide payments. For you we made search for a car by vincode number on the website, as well as select a specific make and model to accurately check for the vehicle you need. Today I want to teach you hot to find safe vehicle from a Copart. For best research, you need to see the car photos very thoroughly and assess the damage to the car. Read the annotation, type of damage, car miles and compare them with the lot images. Check the car paint, the condition of the roof, marks from the Impact staff and the general condition of the lot. If vehicle has a lot of damage then we propose that you contact the experts so that they check the damage and say you the real estimated cost of car repair. We propose that you choose car with minimal damage resulting from minor accidents or weather conditions, as in this case your vehicle will be amazing.