Bidinfo APP

BMW M3 2021 Black Mechanical 3 L WBS53AY03MFL47633

WBS53AY03MFL47633 Photo# 1 WBS53AY03MFL47633 Photo# 2 WBS53AY03MFL47633 Photo# 3 WBS53AY03MFL47633 Photo# 4 WBS53AY03MFL47633 Photo# 5 WBS53AY03MFL47633 Photo# 6 WBS53AY03MFL47633 Photo# 7 WBS53AY03MFL47633 Photo# 8 WBS53AY03MFL47633 Photo# 9 WBS53AY03MFL47633 Photo# 10 WBS53AY03MFL47633 Photo# 11 WBS53AY03MFL47633 Photo# 12
Winning bid: $ 30 750
Are you an owner?
Engine Information
Compression ratio: 9.3 kg/cm2
Number of cylinders: 6
Displacement: 2993 cc
Configuration: Inline
Horsepower: 473 HP
Torque: 406
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 23 mpg
City: 16 mpg

The BMW M3: A High-Performance Sports Sedan


The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.

Exterior Design

The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.

Interior Comfort and Technology

The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.

Performance and Handling

Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.

In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.

Available Vehicle Options
Interior

M Carbon Bucket Seats

Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats

Front Ventilated Seats

M Drive Professional

Intended specifically for use in a controlled environment, such as a car racing track, M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.
Exterior

Moonroof

Power glass moonroof with 1-touch tilt/slide function; Wind deflector that deploys when the moonroof is slid open; The remainder of the roof is body colored metal, replacing the standard equipment Dark Grey carbon fiber reinforced plastic (CFRP) roof.

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Bi-Color alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Orbit Grey alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Bi-Color alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

M Compound Brakes W/Black Calipers

19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Black painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Individual Shadowline Lights

Black inlay trim within the headlight assemblies

Carbon Fiber Exterior Package

Inlays in the front air intakes, rear diffuser and exterior mirror caps; Carbon fiber reinforced plastic (CFRP) rear spoiler

M Compound Brakes W/Red Calipers

Extended Shadowline Trim

High-gloss Black Mirror caps and rear spoiler; Black Chrome tailpipe finishers
Mechanical

M Carbon Ceramic Brakes

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers
Package

M Driver's Package

This is a 1-day high performance driving class created specifically for BMW M vehicles. The class includes hands-on performance driving training in a controlled environment.

Parking Assistance Package

Parking Assistant Plus, which, when engaged, surveys the size of available nearby parallel and perpendicular parking spaces to determine which ones are of adequate size for the M3. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will maneuver the car into that space.; Surround View with 3D View, which, during parking maneuvers, displays real time images of the view around the car onto the screen located on the upper, center part of the dashboard.; Drive Recorder, which is capable of recording video of the vehicle's surroundings and having the captured video played back on the screen located on the upper, center part of the dashboard.

Executive Package

Heated steering wheel; Power trunk open/close; Icon Adaptive LED headlights with Laserlight; Head-up display, which projects images of select travel information, such as vehicle speed and navigation instructions, in front of the driver in a visual field that is beyond the windshield; Wireless charging; Gesture control; WiFi hotspot with complimentary 3-month or 3GB trial
Available Vehicle Colors
Interior

Black Full Merino

Black Extended Merino

Yas Marina Blue/Black Extended Merino W/Yellow Accent

Yas Marina Blue/Black Full Merino W/Yellow Accent

Silverstone/Black Extended Merino

Kyalami Orange/Black Full Merino

Kyalami Orange/Black Extended Merino

Silverstone/Black Full Merino

Exterior

Frozen Portimao Blue Metallic

Tanzanite Blue II Metallic

Portimao Blue Metallic

Isle Of Man Green Metallic

Oxide Grey Metallic

Frozen Brilliant White Metallic

Sao Paulo Yellow

Brooklyn Grey Metallic

Toronto Red Metallic

(Ind) Dravit Grey Metallic

Black Sapphire Metallic

Alpine White

Interior Trim

BMW Individual 'Fineline' Black Silver Effect Open-Pored

BMW Individual Finishers Aluminum Fabric High-Gloss

Individual Piano Black Finish

Carbon Fiber

Aluminum Tetragon

Lot description
As you know, there are some interesting vehicle auctions in the USA. In this case, the Copart vehicle auction put up for sale 2021 BMW M3 with a 3L engine. The auto was sold with minor damage which you can see in the photos. To make everything clear we published the Vin-number of the car WBS53AY03MFL47633. Selection a vehicle from the Copart auction site is a great choice, because you can buy a vehicle for 44% of its price, thereby save your capital and making good decision if you want. This car is a excellent example of a similar solution, because after normal repairs you can drive a nice car at a great price. If you think to buy a nice car from the USA or Canada some times you first need to make an analysis of the best options and check for what price they are sold and in what condition. You can check it at our website because there few companies who publish free data so clear and transparent without any additional fees. You can use the search for a car by VIN number on the website, as well as select a specific make and model to accurately check for the vehicle you need. Today I want to say you ahot to analyze the good auto at the IAAI. For good start, you need to look auto photos rigth scrupulously and assess the damage to the car. Read the lot notes, classification of damage, car odometer and compare them with the car images. Check the car paint, the condition of the roof, marks from the Impact staff and the general condition of the lot. If car has a lot of damage then we suggest that you contact the mechanic so that they evaluate the damage and show you the real estimated cost of vehicle repair. We propose that you choose car with not a lot of problems resulting from minor accidents or weather conditions, as in this case your auto will be as safe after repair as before.