Bidinfo APP

BMW M3 2023 Blue Mechanical 3 L WBS53AY08PFN43961

WBS53AY08PFN43961 Photo# 1 WBS53AY08PFN43961 Photo# 2 WBS53AY08PFN43961 Photo# 3 WBS53AY08PFN43961 Photo# 4 WBS53AY08PFN43961 Photo# 5 WBS53AY08PFN43961 Photo# 6 WBS53AY08PFN43961 Photo# 7 WBS53AY08PFN43961 Photo# 8 WBS53AY08PFN43961 Photo# 9 WBS53AY08PFN43961 Photo# 10 WBS53AY08PFN43961 Photo# 11 WBS53AY08PFN43961 Photo# 12
Winning bid: $ 40 500
Are you an owner?
Engine Information
Compression ratio: 9.3 kg/cm2
Number of cylinders: 6
Displacement: 2993 cc
Configuration: Inline
Horsepower: 473 HP
Torque: 406
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 23 mpg
City: 16 mpg

Sales statistics


The BMW M3: A High-Performance Sports Sedan


The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.

Exterior Design

The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.

Interior Comfort and Technology

The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.

Performance and Handling

Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.

In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.

Available Vehicle Options
Interior

M Carbon Bucket Seats

Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats

Front Ventilated Seats

Personal ESIM 5G

M Drive Professional

Intended specifically for use in a controlled environment, such as a car racing track, M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.

Wireless Device Charging

Drive Recorder

Exterior

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Bi-Color alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Extended Shadowline Trim

High-gloss Black Mirror caps and rear spoiler; Black Chrome tailpipe finishers

Standard Emblems

Replaces "BMW M 50 Years" emblems that are affixed to the car by default

M Compound Brakes W/Black Calipers

M Shadowline Lights

Black inlay trim within the headlight assemblies

M Compound Brakes W/Red Calipers

M Carbon Exterior Package

Inlays in the front air intakes and rear diffuser; M Carbon exterior mirror caps; M Carbon rear spoiler

19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Orbit Grey alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Icon Adaptive LED Headlights W/Laserlight

19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Black painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Bi-Color alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Moonroof

Power glass moonroof with 1-touch tilt/slide function; Wind deflector that deploys when the moonroof is slid open; The remainder of the roof is body colored metal, replacing the standard equipment Dark Grey carbon fiber reinforced plastic (CFRP) roof.
Mechanical

M Carbon Ceramic Brakes

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers
Package

Executive Package

Heated steering wheel; Power trunk open/close; SensaTec (leatherette material) dashboard; Live Cockpit Pro, including navigation

Parking Assistance Package

Parking Assistant Plus, which, when engaged, surveys the size of available nearby parallel and perpendicular parking spaces to determine which ones are of adequate size for the M3. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will maneuver the car into that space.; Surround View with 3D View, which, during parking maneuvers, displays real time images of the view around the car onto the screen located on the upper, center part of the dashboard.

M Driver's Package

This is a 1-day high performance driving class created specifically for BMW M vehicles. The class includes hands-on performance driving training in a controlled environment. The vehicle's top speed limiter will be increased as well.
Available Vehicle Colors
Interior

Kyalami Orange/Black Extended Merino

Fiona Red/Black Extended Merino

Fjord Blue/Black Full Merino

Tartufo Full Merino

Silverstone/Black Full Merino

Yas Marina Blue/Black Full Merino W/Yellow Accent

Ivory White Extended Merino

Tartufo Extended Merino

Yas Marina Blue/Black Extended Merino W/Yellow Accent

Fjord Blue/Black Extended Merino

Ivory White Full Merino

Silverstone/Black Extended Merino

Fiona Red/Black Full Merino

Kyalami Orange/Black Full Merino

Black Full Merino

Black Extended Merino

Exterior

Brooklyn Grey Metallic

Frozen Pure Grey II Metallic

Toronto Red Metallic

Skyscraper Grey Metallic

Aventurin Red Metallic

Frozen Brilliant White Metallic

Black Sapphire Metallic

(Ind) Dravit Grey Metallic

Tanzanite Blue II Metallic

Alpine White

Portimao Blue Metallic

Isle Of Man Green Metallic

Frozen Portimao Blue Metallic

Sao Paulo Yellow

Interior Trim

Aluminum Rhrombicle Anthracite

Carbon Fiber

Individual Piano Black Finish

Individual Aluminum

Lot description
As a lot of people know, there are some popular auto auctions in the United States of America. Not so long ago the Copart auction site put up for sale 2023 BMW M3 with a 3L engine. The auto was up for sale with minor damage which can check in the photos. To show everything clear we published the VIN Code number of the car WBS53AY08PFN43961. Selection a vehicle from the Copart auto auction site is a very good investment, because you can win a car for 47% of its price, thereby save your money if you wish. This car is a nice example of such a case, because after minor repairs you can drive a good car at a reduced price. If you think to buy a good car from United States of America some times you can think about to make an analysis of the nice options and understand for what price they are sold and in what condition. You can check it at this website because there few companies who provide such information so easy and free with no any payments. You can use the search for a car by VIN number on the site, as well as select a specific make and model to accurately check for the vehicle you need. Now I think it’s good to teach you ahot to analyze safe vehicle from a US auto auction. For best research, it’s better to examine auto pictures rigth correctly and assess the damage to the car. Read the annotation, type of damage, car odometer and compare them with the lot photos. Pay attention to the paintwork, the condition of the roof, marks from the IAAI staff and the general condition of the car. If it has a lot of problems then we propose that you contact the mechanic so that they check the damage and say you the real estimated cost and time of auto repair. We recommend that you choose vehicles with little problems resulting from minor accidents or weather conditions, as in this case your auto will be amazing.