Bidinfo APP

BMW M3 2022 Yellow Automatic 3 L WBS43AY01NFN08137

WBS43AY01NFN08137 Photo# 1 WBS43AY01NFN08137 Photo# 2 WBS43AY01NFN08137 Photo# 3 WBS43AY01NFN08137 Photo# 4 WBS43AY01NFN08137 Photo# 5 WBS43AY01NFN08137 Photo# 6 WBS43AY01NFN08137 Photo# 7 WBS43AY01NFN08137 Photo# 8 WBS43AY01NFN08137 Photo# 9 WBS43AY01NFN08137 Photo# 10 WBS43AY01NFN08137 Photo# 11 WBS43AY01NFN08137 Photo# 12
Winning bid: $ 49 500
Are you an owner?
Engine Information
Compression ratio: 9.3 kg/cm2
Number of cylinders: 6
Displacement: 2993 cc
Configuration: Inline
Horsepower: 503 HP
Torque: 479
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 22 mpg
City: 16 mpg

The BMW M3: A High-Performance Sports Sedan


The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.

Exterior Design

The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.

Interior Comfort and Technology

The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.

Performance and Handling

Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.

In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.

Available Vehicle Options
Interior

Front Ventilated Seats

M Drive Professional

Intended specifically for use in a controlled environment, such as a car racing track, M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.

Wireless Charging

Wireless charging tray in the center console

M Carbon Bucket Seats

Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats
Exterior

Moonroof

Power glass moonroof with 1-touch tilt/slide function; Wind deflector that deploys when the moonroof is slid open; The remainder of the roof is body colored metal, replacing the standard equipment Dark Grey carbon fiber reinforced plastic (CFRP) roof.

M Shadowline Lights

Black inlay trim within the headlight assemblies

M Compound Brakes W/Black Calipers

Extended Shadowline Trim Deletion

Body colored mirror caps and rear spoiler; Bright finish tailpipe finishers

Icon Adaptive LED Headlights W/Laserlight

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Bi-Color alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Orbit Grey alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Black painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Standard Emblems

Replaces the standard equipment "50 Years of M" logos with the conventional BMW roundel logos

M Compound Brakes W/Red Calipers

M Carbon Exterior Package

Inlays in the front air intakes and rear diffuser; M Carbon exterior mirror caps; M Carbon rear spoiler
Mechanical

M Carbon Ceramic Brakes

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers
Package

M Driver's Package

This is a 1-day high performance driving class created specifically for BMW M vehicles. The class includes hands-on performance driving training in a controlled environment. The vehicle's top speed limiter will be increased as well.

Executive Package

Remote engine start; Heated steering wheel; Power trunk open/close; Head-up display, which projects images of select travel information, such as vehicle speed and navigation instructions, in front of the driver in a visual field that is beyond the windshield; Gesture control

Driving Assistance Professional Package

Extended Traffic Jam Assistant (for limited access highways), which is a partially automated driving support function; Active Driving Assistant Pro (Active Cruise Control with stop and go functions, Active Lane Keeping Assistant with side collision avoidance, Steering and Traffic Jam Assistant, Automatic Lane Change, Evasion Assistant and Cross-traffic Alert for the front of the car)

Parking Assistance Package

Parking Assistant Plus, which, when engaged, surveys the size of available nearby parallel and perpendicular parking spaces to determine which ones are of adequate size for the M3. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will maneuver the car into that space.; Surround View with 3D View, which, during parking maneuvers, displays real time images of the view around the car onto the screen located on the upper, center part of the dashboard.; Drive Recorder, which is capable of recording video of the vehicle's surroundings and having the captured video played back on the screen located on the upper, center part of the dashboard.
Available Vehicle Colors
Interior

Kyalami Orange/Black Extended Merino

Fjord Blue/Black Extended Merino

Black Full Merino

Tartufo Extended Merino

Fiona Red/Black Full Merino

Black Extended Merino

Silverstone/Black Extended Merino

Silverstone/Black Full Merino

Yas Marina Blue/Black Extended Merino W/Yellow Accent

Kyalami Orange/Black Full Merino

Fjord Blue/Black Full Merino

Ivory White Extended Merino

Tartufo Full Merino

Fiona Red/Black Extended Merino

Ivory White Full Merino

Yas Marina Blue/Black Full Merino W/Yellow Accent

Exterior

Frozen Brilliant White Metallic

Oxide Grey Metallic

Toronto Red Metallic

Brooklyn Grey Metallic

Aventurin Red Metallic

Isle Of Man Green Metallic

Alpine White

Black Sapphire Metallic

Skyscraper Grey Metallic

(Ind) Dravit Grey Metallic

Tanzanite Blue II Metallic

Frozen Portimao Blue Metallic

Portimao Blue Metallic

Sao Paulo Yellow

Interior Trim

Carbon Fiber

Aluminum Tetragon

BMW Individual Finishers Aluminum Fabric High-Gloss

Individual Piano Black Finish

BMW Individual 'Fineline' Black Silver Effect Open-Pored

Lot description
As you know, there are many used and new auto auctions in the United States of America. Recently the Copart auto auction put up for sale 2022 BMW M3 with a 3L engine. The auto was up for sale with several damages which can check in the photos. To show everything clear we published the Vin-number of the car WBS43AY01NFN08137. Buying a car from the Copart auction site is a very profitable investment, because you can win a vehicle for 45% of its price, thereby saving on the acquisition and making a money on it if you want. This car is a excellent example of a similar solution, because after minor repairs you can drive a nice car at a great price. If you want to buy a nice vehicle from the USA, then most likely you can think about to make an analysis of the best options and check for what price they are sold and in what condition. You can do this with convenience on our website, because we are one of the few who publish free data so easy and free with no any payments. For you we made search for a car by VIN number on the site, as well as select a specific make and model to accurately search for the car you need. Today I want to say you how to choose amazing car at the IAAI Auto Auction. For good start, you need to examine the car images very attentively and assess the damage to the car. Read the lot notes, classification of damage, car mileage and compare them with the photos. Look at the paintwork, the condition of the roof, marks from the Copart staff and the general condition of the vehicle. If car has a lot of damage then we suggest that you contact the mechanic so that they check the damage and say you the real estimated price of car repair. We recommend that you choose car with little problems resulting from minor accidents or weather conditions, as in this case your auto will be amazing.