Bidinfo APP

BMW M3 2018 Blue Automatic 3 L WBS8M9C50J5L01089

WBS8M9C50J5L01089 Photo# 1 WBS8M9C50J5L01089 Photo# 2 WBS8M9C50J5L01089 Photo# 3 WBS8M9C50J5L01089 Photo# 4 WBS8M9C50J5L01089 Photo# 5 WBS8M9C50J5L01089 Photo# 6 WBS8M9C50J5L01089 Photo# 7 WBS8M9C50J5L01089 Photo# 8 WBS8M9C50J5L01089 Photo# 9 WBS8M9C50J5L01089 Photo# 10
Winning bid: $ 35 600
Are you an owner?
  • Auction: IAAI Auction IAA Auction
  • Lot Number: 36741773
  • Winning bid: 35 600 $
  • Prebid: 20 075 $
  • Date Sale: 11.08.2023
  • Status: Sold
  • Date Updated: 11.08.2023
  • VIN:

    WBS8M9C50J5L01089

  • Year: 2018
  • Condition: Vehicle Starts
  • Mileage: 76 144 km
  • Transmission: Automatic
  • Body: Sedan
  • Color: Blue
  • Primary Damage: Right Side
  • Secondary Damage: Suspension
  • Drive: Rear Wheel Drive
  • Fuel: Gasoline
  • Airbag State: Intact
  • Seller: Auto Club of Southern CA (ACSC)
  • Cylinders: 6
  • Loss Type: Collision
  • Restraint System: Driver Air Bag; Passenger Air Bag
  • Actual Cash Value: $ 59 133
  • Actual Odometer: Yes
  • Keys: Yes
Engine Information
Compression ratio: 10.2 kg/cm2
Number of cylinders: 6
Displacement: 2979 cc
Configuration: Inline
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger

Sales statistics


The BMW M3: A High-Performance Sports Sedan


The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.

Exterior Design

The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.

Interior Comfort and Technology

The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.

Performance and Handling

Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.

In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.

Available Vehicle Options
Available Vehicle Colors
Lot description
As you know, there are some interesting vehicle auctions in the United States of America. In this case, the Iaai auto auction sold a 2018 BMW M3 with a 3L engine. The car was sold with several damages which can see in the photos. For nothing to be hidden we post the VIN Code number of the car WBS8M9C50J5L01089. Buying an auto from the Iaai auction site is a very good investment, because you can buy a vehicle for 44% of its price, thereby saving on the acquisition and making a money on it if you wish. This car is a nice example of such a case, because after minor repairs you can drive a good car at a excellent price. If you plan to buy a nice car from the USA or Canada some times you first need to make an analysis of the available options and check for what price they are sold and in what condition. You can check it at our website because there few companies who give full info so clear and transparent with no any payments. You may use the search for a car by VIN number on the site, as well as select a specific make and model to accurately search for the vehicle you need. Today I think it’s good to say you hot to find amazing sedan from a Impact. For best selection, you may to check vehicle pictures very heedfully and assess the damage to the car. Read the lot notes, type of damage, car mileage and compare them with the lot photos. Pay attention to the paintwork, the condition of the roof, marks from the auction staff and the general condition of the car. If it has a lot of damage then we propose that you contact the mechanic so that they check the damage and say you the real estimated cost and time of car repair. We recommend that you choose car with minimal problems resulting from minor accidents or weather conditions, as in this case your auto will be as safe after repair as before.