Bidinfo APP

BMW M3 2016 Gray Automatic 3 L WBS8M9C51G5D30113

WBS8M9C51G5D30113 Photo# 1 WBS8M9C51G5D30113 Photo# 2 WBS8M9C51G5D30113 Photo# 3 WBS8M9C51G5D30113 Photo# 4 WBS8M9C51G5D30113 Photo# 5 WBS8M9C51G5D30113 Photo# 6 WBS8M9C51G5D30113 Photo# 7 WBS8M9C51G5D30113 Photo# 8 WBS8M9C51G5D30113 Photo# 9 WBS8M9C51G5D30113 Photo# 10 WBS8M9C51G5D30113 Photo# 11 WBS8M9C51G5D30113 Photo# 12 WBS8M9C51G5D30113 Photo# 13 WBS8M9C51G5D30113 Photo# 14 WBS8M9C51G5D30113 Photo# 15 WBS8M9C51G5D30113 Photo# 16 WBS8M9C51G5D30113 Photo# 17 WBS8M9C51G5D30113 Photo# 18
Are you an owner?
Engine Information
Compression ratio: 10.2 kg/cm2
Number of cylinders: 6
Displacement: 2979 cc
Configuration: Inline
Horsepower: 425 HP
Torque: 406
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 26 mpg
City: 17 mpg

The BMW M3: A High-Performance Sports Sedan


The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.

Exterior Design

The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.

Interior Comfort and Technology

The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.

Performance and Handling

Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.

In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.

Available Vehicle Options
Interior

Enhanced USB And Bluetooth Plus Smartphone Integration

Power Rear Sunshade

Power rear window sunshade; Manual rear side window shades
Exterior

19" Black Double-Spoke Light Alloy Wheels W/Mixed Performance Tires

19" x 9.0" front and 19" x 10.0" rear Double-Spoke (style 437 M) Black painted alloy wheels with 255/35R19 front and 275/35R19 rear performance tires

Moonroof

Power glass moonroof with one-touch and tilt/slide functions and wind deflector. The standard equipment carbon fiber roof will be replaced with a steel roof.

19" Double-Spoke Light Alloy Wheels W/Mixed Performance Tires

19" x 9.0" front and 19" x 10.0" rear Double-Spoke (style 437 M) alloy wheels with 255/35R19 front and 275/35R19 rear performance tires
Mechanical

M Carbon Ceramic Brakes

M Double-Clutch Transmission W/Drivelogic

7-speed double clutch automated manual transmission with Drivelogic

Adaptive M Suspension

Active suspension which automatically adjusts damping to adapt to changing road conditions and different driving styles
Package

Lighting Package

LED high- and low- beam adaptive headlights; LED Corona rings (lights that encircle each headlight); LED cornering lights; LED turn signals; Automatic High Beams, which monitor oncoming vehicles and ambient light levels and turn the high beams on and off, based on those factors

Executive Package

Heated steering wheel; Rear view camera; Heated rear seats (only included when the Executive Package is ordered in combination with either the Extended Merino leather or Full Merino leather upholsteries); Retractable headlight washers; Park Distance Control (front and rear); Head-up display; Cloth/leather combination Carbonstructure Anthracite/Black upholstery

Competition Package

Increased engine output to 444 horsepower; 20" x 9.0" front and 20" x 10.0" rear Star-Spoke (style 666 M) forged alloy wheels with 265/30R20 front and 285/30R20 rear performance tires; Revised steering ratio; Adaptive M Suspension with revised settings; Different Dynamic Stability Control (DSC) setting; Different setting for the Adaptive M Differential; High-gloss black exterior elements including the twin kidney grille surrounds, body side gills and rear M3 badge; Sport exhaust finished in black chrome; M Sport seats with break-through elements in the seatbacks; Front seatbelts with M stripes on them. Black Full Merino leather seat trim with Silverstone-colored stitching is available upon special request to the Regional Distribution Office.

Driver Assistance Plus

Active Blind Spot Detection, which, when the turn signal is activated, monitors the blind spot on the side of the vehicle with the active turn signal. A visual signal on the relevant exterior mirror housing warns the driver of the presence of a vehicle in the blind spot or alerts the driver of a vehicle that is rapidly approaching the blind spot.; Active Driving Assistant, which includes Lane Departure (this driver-activated feature senses any course deviations the car makes at highway speeds when the turn signal is not used, and if such a deviation is identified, the driver is alerted with a vibration sent through the steering wheel), Forward Collision Warning, Pedestrian Warning and City Collision Mitigation; Side and Top View Cameras; Speed Limit Info
Safety

Parking Assistant

When engaged, Parking Assistant surveys the size of available nearby parking spaces to determine which ones are of adequate size for the M3. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will provide all steering inputs required to maneuver the car into that space. In a combined effort with Parking Assistant, the driver must select the appropriate gear and control the accelerator and brakes to park the car.

Side And Top View Cameras

Cameras on the exterior of the vehicle are positioned in such a way as to display the areas behind and on either side of the vehicle, shown on the display mounted in the center of the dashboard.
Available Vehicle Colors
Interior

Sakhir Orange/Black Extended Merino

Sakhir Orange/Black Full Merino

Cohiba Brown/Black Extended Merino (Individual)

Amaro Brown Extended Merino (Individual)

Nutmeg Extended Merino (Individual)

Sonoma Beige Full Merino

Silverstone Full Merino

Black Full Merino W/Silverstone Stitching

Black Extended Merino

Combination Carbonstructure Anthracite/Black

Golden Brown Extended Merino (Individual)

Opal White Extended Merino (Individual)

Silverstone Extended Merino

Black Full Merino

Sonoma Beige Extended Merino

Exterior

Alpine White

Azurite Black Metallic

Silverstone Metallic

Black Sapphire Metallic

Mineral White Metallic

Austin Yellow Metallic

Sakhir Orange Metallic

Tanzanite Blue Metallic

Champagne Quartz Metallic

Smoked Topaz Metallic

Mineral Grey Metallic

Yas Marina Blue Metallic

Interior Trim

White Ash Grain Wood

Carbon Fiber W/Black Chrome Highlight

Dark Red Sycamore Wood

Aluminum Blade W/Black Chrome Highlight

Piano Finish Black

Fineline Anthracite W/Pearl Gloss Chrome Highlight

Lot description
As people know, there are many used and new car auctions in the USA. Recently the Iaai vehicle auction put up for sale 2016 BMW M3 with a 3L engine. The vehicle was sold with several damages which you can see in the photos. For nothing to be hidden we post the VIN Code number of the car WBS8M9C51G5D30113. Selection a vehicle from the Iaai auto auction site is a great choice, because you can win an auto for 42% of its price, thereby saving on the acquisition and making a money on it if you wish. This car is a excellent example of a similar solution, because after normal repairs you can drive a good car at a excellent price. If you think to buy amazing vehicle from the USA, some times you first need to make an analysis of the nice options and check for what price they are sold and in what condition. You can check it at this website because not a lot of companies who give full info in the most convenient and simple way with no any payments. For you we made search for a car by vincode number on the site, as well as select a specific make and model to accurately check for the car you need. Today I think it’s good to teach you how to research the right car at the Impact. For best selection, you may to check the car images very thoroughly and assess the damage to the car. Read the car info, classification of damage, car odometer and compare them with the lot photos. Check the car paint, the condition of the roof, marks from the Impact staff and the general condition of the lot. If it has a lot of damage then we propose that you contact the mechanic so that they evaluate the problems and show you the real estimated price of car repair. We propose that you choose vehicles with not a lot of damage resulting from minor accidents or weather conditions, as in this case your vehicle will be amazing.