BMW M3 2023 Gray Automatic 3 L WBS43AY04PFP11641
-
Auction:
IAA Auction
- Lot Number: 40372068
- Winning bid: 57 250 $
- Price Repair: 51 492 $
- Date Sale: 07.10.2024
- Status: Sold
- Date Updated: 07.10.2024
-
VIN:
WBS43AY04PFP11641
- Year: 2023
- Condition: Run & Drive Verified
- Mileage: 18 636 km
- Transmission: Automatic
- Body: Sedan
- Color: Gray
- Primary Damage: Rear
- Secondary Damage:
- Estimated Repair Cost: $ 51 492
- Drive: All Wheel Drive
- Fuel: Automatic
- Sale type: On Minimum Bid
- Airbag State: Intact
- Seller: Progressive Casualty Insurance
- Cylinders: 6
- Loss Type: Collision
- Actual Odometer: Yes
- Keys: Yes
- Actual Cash Value: $ 95 707
The BMW M3: A High-Performance Sports Sedan
The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.
Exterior Design
The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.
Interior Comfort and Technology
The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.
Performance and Handling
Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.
In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.
M Carbon Bucket Seats
Wireless Device Charging
Drive Recorder
Personal ESIM 5G
M Drive Professional
Front Ventilated Seats
M Carbon Exterior Package
Moonroof
M Compound Brakes W/Black Calipers
19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires
BMW IPerformance Design Elements Deletion
Standard Emblems
M Shadowline Lights
M Compound Brakes W/Red Calipers
Icon Adaptive LED Headlights W/Laserlight
19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires
19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires
M Carbon Ceramic Brakes
Driving Assistance Professional Package
Executive Package
Parking Assistance Package
M Driver's Package
Yas Marina Blue/Black Extended Merino W/Yellow Accent
Kyalami Orange/Black Full Merino
Fjord Blue/Black Full Merino
Silverstone/Black Full Merino
Ivory White Extended Merino
Silverstone/Black Extended Merino
Tartufo Extended Merino
Black Extended Merino
Fiona Red/Black Extended Merino
Fiona Red/Black Full Merino
Ivory White Full Merino
Tartufo Full Merino
Fjord Blue/Black Extended Merino
Yas Marina Blue/Black Full Merino W/Yellow Accent
Kyalami Orange/Black Extended Merino
Black Full Merino
Frozen Portimao Blue Metallic
Brooklyn Grey Metallic
Tanzanite Blue II Metallic
Black Sapphire Metallic
Sao Paulo Yellow
Frozen Pure Grey II Metallic
Toronto Red Metallic
Skyscraper Grey Metallic
Portimao Blue Metallic
Alpine White
Frozen Brilliant White Metallic
Aventurin Red Metallic
(Ind) Dravit Grey Metallic
Isle Of Man Green Metallic
Individual Aluminum
Individual Piano Black Finish
Carbon Fiber
Aluminum Rhrombicle Anthracite