Bidinfo APP

BMW M3 2023 Gray Automatic 3 L WBS43AY00PFN65268

WBS43AY00PFN65268 Photo# 1 WBS43AY00PFN65268 Photo# 2 WBS43AY00PFN65268 Photo# 3 WBS43AY00PFN65268 Photo# 4 WBS43AY00PFN65268 Photo# 5 WBS43AY00PFN65268 Photo# 6 WBS43AY00PFN65268 Photo# 7 WBS43AY00PFN65268 Photo# 8 WBS43AY00PFN65268 Photo# 9 WBS43AY00PFN65268 Photo# 10 WBS43AY00PFN65268 Photo# 11 WBS43AY00PFN65268 Photo# 12 WBS43AY00PFN65268 Photo# 13 WBS43AY00PFN65268 Photo# 14 WBS43AY00PFN65268 Photo# 15 WBS43AY00PFN65268 Photo# 16 WBS43AY00PFN65268 Photo# 17 WBS43AY00PFN65268 Photo# 18 WBS43AY00PFN65268 Photo# 19 WBS43AY00PFN65268 Photo# 20 WBS43AY00PFN65268 Photo# 21
Winning bid: $ 19 200
Buy now price: $ 32 900
Are you an owner?
  • Auction: IAAI Auction IAA Auction
  • Lot Number: 41079838
  • Winning bid: 19 200 $
  • Buy Now Price: 32 900 $
  • Price Repair: 56 700 $
  • Date Sale: 25.02.2025
  • Status: Sold
  • Date Updated: 19.02.2025
  • VIN:

    WBS43AY00PFN65268

  • Year: 2023
  • Condition: Run & Drive Verified
  • Mileage: 23 890 km
  • Transmission: Automatic
  • Body: Sedan
  • Color: Gray
  • Primary Damage: Front
  • Secondary Damage: Rear
  • Estimated Repair Cost: $ 56 700
  • Drive: All Wheel Drive
  • Fuel: Automatic
  • Sale type: On Minimum Bid
  • Airbag State: Deployed
  • Seller: Geico Insurance
  • Cylinders: 6
  • Loss Type: Collision
  • Actual Odometer: Yes
  • Keys: Yes
  • Actual Cash Value: $ 82 276
Engine Information
Compression ratio: 9.3 kg/cm2
Number of cylinders: 6
Displacement: 2993 cc
Configuration: Inline
Horsepower: 503 HP
Torque: 479
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 22 mpg
City: 16 mpg

Sales statistics


The BMW M3: A High-Performance Sports Sedan


The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.

Exterior Design

The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.

Interior Comfort and Technology

The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.

Performance and Handling

Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.

In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.

Available Vehicle Options
Interior

M Carbon Bucket Seats

Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats

Wireless Device Charging

Drive Recorder

Personal ESIM 5G

M Drive Professional

Intended specifically for use in a controlled environment, such as a car racing track, M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.

Front Ventilated Seats

Exterior

M Carbon Exterior Package

Inlays in the front air intakes and rear diffuser; M Carbon exterior mirror caps; M Carbon rear spoiler

Moonroof

Power glass moonroof with 1-touch tilt/slide function; Wind deflector that deploys when the moonroof is slid open; The remainder of the roof is body colored metal, replacing the standard equipment Dark Grey carbon fiber reinforced plastic (CFRP) roof.

M Compound Brakes W/Black Calipers

19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Black painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

BMW IPerformance Design Elements Deletion

Standard Emblems

Replaces "BMW M 50 Years" emblems that are affixed to the car by default

M Shadowline Lights

Black inlay trim within the headlight assemblies

M Compound Brakes W/Red Calipers

Icon Adaptive LED Headlights W/Laserlight

19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Orbit Grey alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Bi-Color alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires
Mechanical

M Carbon Ceramic Brakes

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers
Package

Driving Assistance Professional Package

Extended Traffic Jam Assistant (for limited access highways), which is a partially automated driving support function; Active Driving Assistant Pro (Active Cruise Control with stop and go functions, Active Lane Keeping Assistant with side collision avoidance, Steering and Traffic Jam Assistant, Automatic Lane Change, Evasion Assistant and Cross-traffic Alert for the front of the car)

Executive Package

Remote engine start; Heated steering wheel; Power trunk open/close; SensaTec (leatherette material) dashboard; Live Cockpit Pro, including navigation

Parking Assistance Package

Parking Assistant Plus, which, when engaged, surveys the size of available nearby parallel and perpendicular parking spaces to determine which ones are of adequate size for the M3. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will maneuver the car into that space.; Surround View with 3D View, which, during parking maneuvers, displays real time images of the view around the car onto the screen located on the upper, center part of the dashboard.

M Driver's Package

This is a 1-day high performance driving class created specifically for BMW M vehicles. The class includes hands-on performance driving training in a controlled environment. The vehicle's top speed limiter will be increased as well.
Available Vehicle Colors
Interior

Yas Marina Blue/Black Extended Merino W/Yellow Accent

Kyalami Orange/Black Full Merino

Fjord Blue/Black Full Merino

Silverstone/Black Full Merino

Ivory White Extended Merino

Silverstone/Black Extended Merino

Tartufo Extended Merino

Black Extended Merino

Fiona Red/Black Extended Merino

Fiona Red/Black Full Merino

Ivory White Full Merino

Tartufo Full Merino

Fjord Blue/Black Extended Merino

Yas Marina Blue/Black Full Merino W/Yellow Accent

Kyalami Orange/Black Extended Merino

Black Full Merino

Exterior

Frozen Portimao Blue Metallic

Brooklyn Grey Metallic

Tanzanite Blue II Metallic

Black Sapphire Metallic

Sao Paulo Yellow

Frozen Pure Grey II Metallic

Toronto Red Metallic

Skyscraper Grey Metallic

Portimao Blue Metallic

Alpine White

Frozen Brilliant White Metallic

Aventurin Red Metallic

(Ind) Dravit Grey Metallic

Isle Of Man Green Metallic

Interior Trim

Individual Aluminum

Individual Piano Black Finish

Carbon Fiber

Aluminum Rhrombicle Anthracite

Lot description
As people know, there are many used and new vehicle auctions in the USA. Recently the Iaai vehicle auction sold a 2023 BMW M3 with a 3L engine. The vehicle was sold with several damages which can see in the photos. To make everything clear we post the VIN Code number of the car WBS43AY00PFN65268. Buying a car from the Iaai auction site is a very profitable investment, because you can buy a car for 40% of its price, thereby save your capital and making good decision if you want. This car is a good example of such a case, because after minor repairs you can drive a good car at a reduced price. If you plan to buy a good vehicle from the USA, some times you can think about to make an analysis of the nice options and understand for what price they are sold and in what condition. You can do this with convenience on our website, because we are one of the few who publish free data so easy and free without hide payments. You can use the search for a car by VIN number on the site, as well as select a specific make and model to accurately check for the vehicle you need. Now I want to teach you hot to find safe vehicle at the Impact. For best selection, you need to see the car images rigth thoroughly and assess the damage to the car. Read the description, type of damage, car odometer and compare them with the lot photos. Pay attention to the car paint, the condition of the roof, marks from the auction staff and the general condition of the car. If it has a lot of problems then we recommend that you contact the experts so that they evaluate the problems and calculate you the real estimated cost and time of car repair. We recommend that you choose vehicles with minimal damage resulting from minor accidents or weather conditions, as in this case your vehicle will be good.