Bidinfo APP

BMW M3 2025 Gray Automatic 3 L WBS33HJ04SFU25148

WBS33HJ04SFU25148 Photo# 1 WBS33HJ04SFU25148 Photo# 2 WBS33HJ04SFU25148 Photo# 3 WBS33HJ04SFU25148 Photo# 4 WBS33HJ04SFU25148 Photo# 5 WBS33HJ04SFU25148 Photo# 6 WBS33HJ04SFU25148 Photo# 7 WBS33HJ04SFU25148 Photo# 8 WBS33HJ04SFU25148 Photo# 9 WBS33HJ04SFU25148 Photo# 10 WBS33HJ04SFU25148 Photo# 11 WBS33HJ04SFU25148 Photo# 12 WBS33HJ04SFU25148 Photo# 13 WBS33HJ04SFU25148 Photo# 14 WBS33HJ04SFU25148 Photo# 15 WBS33HJ04SFU25148 Photo# 16 WBS33HJ04SFU25148 Photo# 17
Winning bid: $ 46 450
Are you an owner?
  • Auction: IAAI Auction IAA Auction
  • Lot Number: 41942920
  • Winning bid: 46 450 $
  • Price Repair: 74 305 $
  • Date Sale: 28.05.2025
  • Status: Sold
  • Date Updated: 08.08.2025
  • VIN:

    WBS33HJ04SFU25148

  • Year: 2025
  • Condition: Run & Drive Verified
  • Mileage: 1 876 km
  • Transmission: Automatic
  • Body: Sedan
  • Color: Gray
  • Primary Damage: All Over
  • Secondary Damage:
  • Estimated Repair Cost: $ 74 305
  • Drive: All Wheel Drive
  • Fuel: Gasoline
  • Sale type: On Minimum Bid
  • Airbag State: Intact
  • Seller: Progressive Casualty Insurance
  • Cylinders: 6
  • Loss Type: Collision
  • Actual Odometer: Yes
  • Keys: Yes
  • Actual Cash Value: $ 95 169

Sales statistics


The BMW M3: A High-Performance Sports Sedan


The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.

Exterior Design

The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.

Interior Comfort and Technology

The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.

Performance and Handling

Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.

In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.

Lot description
As a lot of people know, there are many famous vehicle auctions in the United States of America. Recently the Iaai auction site sold a 2025 BMW M3 with a 3L engine. The vehicle was sold with minor damage which you can see in the photos. To show everything clear we published the VIN Code number of the car WBS33HJ04SFU25148. Selection a vehicle from the Iaai auto auction site is a great choice, because you can win a car for 47% of its price, thereby saving on the acquisition and making a money on it if you wish. This car is a good example of such a case, because after normal repairs you can drive a good car at a excellent price. If you want to buy amazing car from United States of America some times you can think about to make an analysis of the best options and understand for what price they are sold and in what condition. You can check it at this website because there few companies who publish free data so easy and free without any additional fees. For you we made search for a car by VIN number on the website, as well as select a specific make and model to accurately search for the vehicle you need. Now I think it’s good to tell you ahot to analyze the right vehicle from a IAAI Auto Auction. For best research, you may to look auto pictures very correctly and assess the damage to the car. Read the annotation, category of damage, car odometer and compare them with the lot images. Pay attention to the paintwork, the condition of the roof, marks from the Impact staff and the general condition of the lot. If vehicle has a lot of damage then we propose that you contact the experts so that they evaluate the problems and say you the real estimated price of vehicle repair. We propose that you choose car with small problems resulting from minor accidents or weather conditions, as in this case your vehicle will be amazing.