Bidinfo APP

BMW M4 2021 Black Automatic 3 L WBS33AZ0XMCG10825

WBS33AZ0XMCG10825 Photo# 1 WBS33AZ0XMCG10825 Photo# 2 WBS33AZ0XMCG10825 Photo# 3 WBS33AZ0XMCG10825 Photo# 4 WBS33AZ0XMCG10825 Photo# 5 WBS33AZ0XMCG10825 Photo# 6 WBS33AZ0XMCG10825 Photo# 7 WBS33AZ0XMCG10825 Photo# 8 WBS33AZ0XMCG10825 Photo# 9 WBS33AZ0XMCG10825 Photo# 10 WBS33AZ0XMCG10825 Photo# 11 WBS33AZ0XMCG10825 Photo# 12 WBS33AZ0XMCG10825 Photo# 13
Winning bid: $ 23 300
Are you an owner?
  • Auction: Copart Auto Auction Copart Auto Auction
  • Lot Number: 61214343
  • Winning bid: 23 300 $
  • Prebid: 21 600 $
  • Date Sale: 10.10.2023
  • Status: Sold
  • Date Updated: 10.10.2023
  • VIN:

    WBS33AZ0XMCG10825

  • Year: 2021
  • Condition: Cannot Start
  • Mileage: 38 615 km
  • Transmission: Automatic
  • Color: Black
  • Primary Damage: Front
  • Drive: Rear Wheel Drive
  • Fuel: Gasoline
  • Sale type: Pure Sale
  • Documents: FL - RB
  • Keys Present: No
  • Cylinders: 6
  • Trim: COMPETITION
  • Grid/Row: D020
  • Retail Price: 67250
Engine Information
Compression ratio: 9.3 kg/cm2
Number of cylinders: 6
Displacement: 2993 cc
Configuration: Inline
Horsepower: 503 HP
Torque: 479
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 23 mpg
City: 16 mpg

Sales statistics


The BMW M4: A High-Performance Sports Car


If you are a car enthusiast looking for a high-performance sports car, the BMW M4 should definitely be on your list of considerations. With its sleek design, powerful engine, and dynamic handling, this car is sure to impress even the most discerning driver.

Design

The BMW M4 has a low, wide stance that gives it an aggressive and athletic look. The car's long hood and short overhangs create a muscular appearance, while its sharp lines and bold curves convey a sense of speed and agility.

The interior of the BMW M4 is just as impressive as its exterior. The driver-focused cockpit is designed to provide a comfortable and engaging driving experience, with high-quality materials and intuitive controls. The car also features a spacious and well-appointed cabin, complete with premium amenities like heated and ventilated leather seats, a panoramic sunroof, and a premium sound system.

Performance

Under the hood, the BMW M4 is powered by a turbocharged 3.0-liter inline-six engine that delivers an impressive 473 horsepower and 406 lb-ft of torque. This engine provides the M4 with quick acceleration, brisk performance, and a top speed of 155 mph.

The BMW M4 also features a number of performance-enhancing technologies, including an adaptive suspension system that adjusts to your driving style and the road conditions, as well as a high-performance braking system that provides confident stopping power. Additionally, the car is available with a number of driving modes, including a sport mode that sharpens throttle response, transmission tuning, and suspension firmness, and a comfort mode that provides a more relaxed driving experience.

Conclusion

In conclusion, the BMW M4 is a truly exceptional sports car that combines sleek design, powerful performance, and dynamic handling in a single, attractive package. Whether you are looking for a weekend toy or a daily driver, the BMW M4 is definitely worth considering. So if you are in the market for a high-performance sports car, be sure to check out the BMW M4.

Available Vehicle Options
Interior

M Carbon Bucket Seats

Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats

M Drive Professional

Intended specifically for use in a controlled environment, such as a car racing track, M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.

Front Ventilated Seats

Exterior

Individual Shadowline Lights

Black inlay trim within the headlight assemblies

M Compound Brakes W/Black Calipers

Extended Shadowline Trim Deletion

Body colored mirror caps and rear spoiler; Bright finish tailpipe finishers

M Compound Brakes W/Red Calipers

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Bi-Color alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Orbit Grey alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

18"/19" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

18" x 9.5" front and 19" x 10.5" rear M Double-Spoke (style 824M) Orbit Grey painted alloy wheels with 275/40R18 front and 285/35R19 rear non run-flat performance tires

Carbon Fiber Exterior Package

Inlays in the front air intakes, rear diffuser and exterior mirror caps; Carbon fiber reinforced plastic (CFRP) rear spoiler

Moonroof

Power glass moonroof with 1-touch tilt/slide function; Wind deflector that deploys when the moonroof is slid open; The remainder of the roof is body colored metal, replacing the standard equipment Dark Grey carbon fiber reinforced plastic (CFRP) roof.

19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Black painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires
Mechanical

M Carbon Ceramic Brakes

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers
Package

Driving Assistance Professional Package

Extended Traffic Jam Assistant (for limited access highways), which is a partially automated driving support function; Active Driving Assistant Pro (Active Cruise Control with stop and go functions, Active Lane Keeping Assistant with side collision avoidance, Steering and Traffic Jam Assistant, Automatic Lane Change, Evasion Assistant and Cross-traffic Alert for the front of the car)

Executive Package

Remote engine start; Heated steering wheel; Power trunk open/close; Icon Adaptive LED headlights with Laserlight; Head-up display, which projects images of select travel information, such as vehicle speed and navigation instructions, in front of the driver in a visual field that is beyond the windshield; Wireless charging; Gesture control; WiFi hotspot with complimentary 3-month or 3GB trial

M Driver's Package

This is a 1-day high performance driving class created specifically for BMW M vehicles. The class includes hands-on performance driving training in a controlled environment.

Parking Assistance Package

Parking Assistant Plus, which, when engaged, surveys the size of available nearby parallel and perpendicular parking spaces to determine which ones are of adequate size for the M4. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will maneuver the car into that space.; Surround View with 3D View, which, during parking maneuvers, displays real time images of the view around the car onto the screen located on the upper, center part of the dashboard.; Drive Recorder, which is capable of recording video of the vehicle's surroundings and having the captured video played back on the screen located on the upper, center part of the dashboard.
Available Vehicle Colors
Interior

Black Extended Merino

Silverstone/Black Extended Merino

Kyalami Orange/Black Full Merino

Kyalami Orange/Black Extended Merino

Yas Marina Blue/Black Full Merino W/Yellow Accent

Silverstone/Black Full Merino

Black Full Merino

Yas Marina Blue/Black Extended Merino W/Yellow Accent

Exterior

Isle Of Man Green Metallic

Tanzanite Blue II Metallic

(Ind) Dravit Grey Metallic

Sao Paulo Yellow

Black Sapphire Metallic

Alpine White

Portimao Blue Metallic

Frozen Portimao Blue Metallic

Toronto Red Metallic

Frozen Brilliant White Metallic

Brooklyn Grey Metallic

Interior Trim

Aluminum Tetragon

Individual Piano Black Finish

Carbon Fiber

BMW Individual Finishers Aluminum Fabric High-Gloss

BMW Individual 'Fineline' Black Silver Effect Open-Pored

Lot description
It has already become popular and everyone knows, there are some popular auto auctions in the United States of America. Recently the Copart car auction put up for sale 2021 BMW M4 with a 3L engine. The auto was up for sale with minor damage which you can see in the photos. To make everything clear we published the vincode of the car WBS33AZ0XMCG10825. Selection an auto from the Copart auto auction site is a very good investment, because you can win a car for 47% of its price, thereby save your capital and making good decision if you want. This car is a excellent example of a similar solution, because after minor repairs you can drive a good car at a reduced price. If you want to buy a nice car from United States some times you first need to make an analysis of the available options and understand for what price they are sold and in what condition. You can check it at this website because not a lot of companies who give full information so easy and useful with no any payments. You can use the search for a car by vincode number on the website, as well as select a specific make and model to accurately search for the vehicle you need. Now I want to tell you how to choose amazing vehicle at the Impact. For good start, you need to look auto vincode photos rigth thoroughly and assess the damage to the car. Read the annotation, type of damage, car odometer and compare them with the photos. Look at the car paint, the condition of the roof, marks from the Copart staff and the general condition of the vehicle. If car has a lot of damage then we propose that you contact the experts so that they check the damage and inform you the real estimated cost and time of vehicle repair. We recommend that you choose car with not a lot of damage resulting from minor accidents or weather conditions, as in this case your vehicle will be amazing.