BMW M4 2019 Blue Automatic 3 L WBS3S7C56KAC09579
-
Auction:
Copart Auto Auction
- Lot Number: 64801565
- Winning bid: 34 000 $
- Prebid: 30 250 $
- Date Sale: 02.09.2025
- Status: Sold
- Date Updated: 02.09.2025
-
VIN:
WBS3S7C56KAC09579
- Year: 2019
- Condition: Cannot Start
- Mileage: 59 304 km
- Transmission: Automatic
- Color: Blue
- Primary Damage: Front
- Drive: Rear Wheel Drive
- Fuel: Gasoline
- Sale type: Pure Sale
- Documents: NC - SC
- Keys Present: No
- Cylinders: 6
- Trim: CS
- Grid/Row: F190
- Retail Price: 48640
The BMW M4: A High-Performance Sports Car
If you are a car enthusiast looking for a high-performance sports car, the BMW M4 should definitely be on your list of considerations. With its sleek design, powerful engine, and dynamic handling, this car is sure to impress even the most discerning driver.
Design
The BMW M4 has a low, wide stance that gives it an aggressive and athletic look. The car's long hood and short overhangs create a muscular appearance, while its sharp lines and bold curves convey a sense of speed and agility.
The interior of the BMW M4 is just as impressive as its exterior. The driver-focused cockpit is designed to provide a comfortable and engaging driving experience, with high-quality materials and intuitive controls. The car also features a spacious and well-appointed cabin, complete with premium amenities like heated and ventilated leather seats, a panoramic sunroof, and a premium sound system.
Performance
Under the hood, the BMW M4 is powered by a turbocharged 3.0-liter inline-six engine that delivers an impressive 473 horsepower and 406 lb-ft of torque. This engine provides the M4 with quick acceleration, brisk performance, and a top speed of 155 mph.
The BMW M4 also features a number of performance-enhancing technologies, including an adaptive suspension system that adjusts to your driving style and the road conditions, as well as a high-performance braking system that provides confident stopping power. Additionally, the car is available with a number of driving modes, including a sport mode that sharpens throttle response, transmission tuning, and suspension firmness, and a comfort mode that provides a more relaxed driving experience.
Conclusion
In conclusion, the BMW M4 is a truly exceptional sports car that combines sleek design, powerful performance, and dynamic handling in a single, attractive package. Whether you are looking for a weekend toy or a daily driver, the BMW M4 is definitely worth considering. So if you are in the market for a high-performance sports car, be sure to check out the BMW M4.
M Carbon Ceramic Brakes
Executive Package
Combination Alcantara/Leather Anthracite
Alpine White
Black Sapphire Metallic
San Marino Blue Metallic
Frozen Dark Blue II
Lime Rock Grey