BMW M4 2015 White Automatic 3 L WBS3R9C5XFK334234
-
Auction:
Copart Auto Auction
- Lot Number: 68159274
- Winning bid: 9 500 $
- Prebid: 9 100 $
- Date Sale: 30.09.2024
- Status: Sold
- Date Updated: 12.10.2024
-
VIN:
WBS3R9C5XFK334234
- Year: 2015
- Mileage: 88 075 km
- Transmission: Automatic
- Color: White
- Primary Damage: Front
- Drive: Rear Wheel Drive
- Fuel: Gasoline
- Sale type: On Minimum Bid
- Documents: SC - ST
- Keys Present: No
- Cylinders: 6
- Grid/Row: K150
- Retail Price: 32691
The BMW M4: A High-Performance Sports Car
If you are a car enthusiast looking for a high-performance sports car, the BMW M4 should definitely be on your list of considerations. With its sleek design, powerful engine, and dynamic handling, this car is sure to impress even the most discerning driver.
Design
The BMW M4 has a low, wide stance that gives it an aggressive and athletic look. The car's long hood and short overhangs create a muscular appearance, while its sharp lines and bold curves convey a sense of speed and agility.
The interior of the BMW M4 is just as impressive as its exterior. The driver-focused cockpit is designed to provide a comfortable and engaging driving experience, with high-quality materials and intuitive controls. The car also features a spacious and well-appointed cabin, complete with premium amenities like heated and ventilated leather seats, a panoramic sunroof, and a premium sound system.
Performance
Under the hood, the BMW M4 is powered by a turbocharged 3.0-liter inline-six engine that delivers an impressive 473 horsepower and 406 lb-ft of torque. This engine provides the M4 with quick acceleration, brisk performance, and a top speed of 155 mph.
The BMW M4 also features a number of performance-enhancing technologies, including an adaptive suspension system that adjusts to your driving style and the road conditions, as well as a high-performance braking system that provides confident stopping power. Additionally, the car is available with a number of driving modes, including a sport mode that sharpens throttle response, transmission tuning, and suspension firmness, and a comfort mode that provides a more relaxed driving experience.
Conclusion
In conclusion, the BMW M4 is a truly exceptional sports car that combines sleek design, powerful performance, and dynamic handling in a single, attractive package. Whether you are looking for a weekend toy or a daily driver, the BMW M4 is definitely worth considering. So if you are in the market for a high-performance sports car, be sure to check out the BMW M4.
Harman Kardon Surround Sound System
Power Rear Sunshade
Concierge Services
Enhanced USB And Bluetooth Plus Smartphone Integration
Side And Top View Cameras
19" Black Double-Spoke Light Alloy Wheels W/Mixed Performance Tires
Moonroof
19" Double-Spoke Light Alloy Wheels W/Mixed Performance Tires
M Carbon Ceramic Brakes
Adaptive M Suspension
M Double-Clutch Transmission W/Drivelogic
Lighting Package
Driver Assistance Plus
Executive Package
Parking Assistant
Sonoma Beige Full Merino
Sonoma Beige Extended Merino
Combination Carbonstructure Anthracite/Black
Silverstone Extended Merino
Sakhir Orange/Black Extended Merino
Black Extended Merino
Silverstone Full Merino
Black Full Merino
Sakhir Orange/Black Full Merino
Austin Yellow Metallic
Sakhir Orange Metallic
Black Sapphire Metallic
Yas Marina Blue Metallic
Mineral Grey Metallic
Alpine White
Mineral White Metallic
Silverstone Metallic
Anthracite Wood W/Pearl Gloss Chrome Highlight Trim Finishers
Carbon Fiber
Aluminum Blade W/Black Chrome Highlight Trim Finishers