Bidinfo APP

BMW M4 2023 White 3 L WBS43AZ05PCM16256

WBS43AZ05PCM16256 Photo# 1 WBS43AZ05PCM16256 Photo# 2 WBS43AZ05PCM16256 Photo# 3 WBS43AZ05PCM16256 Photo# 4 WBS43AZ05PCM16256 Photo# 5 WBS43AZ05PCM16256 Photo# 6 WBS43AZ05PCM16256 Photo# 7 WBS43AZ05PCM16256 Photo# 8 WBS43AZ05PCM16256 Photo# 9 WBS43AZ05PCM16256 Photo# 10 WBS43AZ05PCM16256 Photo# 11 WBS43AZ05PCM16256 Photo# 12
Winning bid: $ 30 750
Buy now price: $ 46 900
Are you an owner?
  • Auction: Copart Auto Auction Copart Auto Auction
  • Lot Number: 73317093
  • Winning bid: 30 750 $
  • Buy Now Price: 46 900 $
  • Date Sale: 15.12.2023
  • Status: Sold
  • Date Updated: 11.12.2023
  • VIN:

    WBS43AZ05PCM16256

  • Year: 2023
  • Condition: Cannot Start
  • Mileage: 5 792 km
  • Color: White
  • Primary Damage: All Over
  • Drive: All Wheel Drive
  • Fuel: Gasoline
  • Sale type: On Approval
  • Documents: MS - ST
  • Keys Present: No
  • Cylinders: 6
  • Trim: COMPETITION
  • Grid/Row: BP
  • Retail Price: 96338
Engine Information
Compression ratio: 9.3 kg/cm2
Number of cylinders: 6
Displacement: 2993 cc
Configuration: Inline
Horsepower: 503 HP
Torque: 479
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 22 mpg
City: 16 mpg

Sales statistics


The BMW M4: A High-Performance Sports Car


If you are a car enthusiast looking for a high-performance sports car, the BMW M4 should definitely be on your list of considerations. With its sleek design, powerful engine, and dynamic handling, this car is sure to impress even the most discerning driver.

Design

The BMW M4 has a low, wide stance that gives it an aggressive and athletic look. The car's long hood and short overhangs create a muscular appearance, while its sharp lines and bold curves convey a sense of speed and agility.

The interior of the BMW M4 is just as impressive as its exterior. The driver-focused cockpit is designed to provide a comfortable and engaging driving experience, with high-quality materials and intuitive controls. The car also features a spacious and well-appointed cabin, complete with premium amenities like heated and ventilated leather seats, a panoramic sunroof, and a premium sound system.

Performance

Under the hood, the BMW M4 is powered by a turbocharged 3.0-liter inline-six engine that delivers an impressive 473 horsepower and 406 lb-ft of torque. This engine provides the M4 with quick acceleration, brisk performance, and a top speed of 155 mph.

The BMW M4 also features a number of performance-enhancing technologies, including an adaptive suspension system that adjusts to your driving style and the road conditions, as well as a high-performance braking system that provides confident stopping power. Additionally, the car is available with a number of driving modes, including a sport mode that sharpens throttle response, transmission tuning, and suspension firmness, and a comfort mode that provides a more relaxed driving experience.

Conclusion

In conclusion, the BMW M4 is a truly exceptional sports car that combines sleek design, powerful performance, and dynamic handling in a single, attractive package. Whether you are looking for a weekend toy or a daily driver, the BMW M4 is definitely worth considering. So if you are in the market for a high-performance sports car, be sure to check out the BMW M4.

Available Vehicle Options
Interior

Front Ventilated Seats

Wireless Charging

Wireless charging tray in the center console

M Carbon Bucket Seats

Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats

Drive Recorder

M Drive Professional

Intended specifically for use in a controlled environment, such as a car racing track, M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.
Exterior

M Compound Brakes W/Red Calipers

BMW IPerformance Design Elements Deletion

19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Black painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

M Shadowline Lights

Black inlay trim within the headlight assemblies

M Carbon Exterior Package

Inlays in the front air intakes and rear diffuser; M Carbon exterior mirror caps; M Carbon rear spoiler

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Bi-Color alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Moonroof

Power glass moonroof with 1-touch tilt/slide function; Wind deflector that deploys when the moonroof is slid open; The remainder of the roof is body colored metal, replacing the standard equipment Dark Grey carbon fiber reinforced plastic (CFRP) roof.

19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Orbit Grey alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Standard Emblems

Replaces the standard equipment "50 Years of M" logos with the conventional BMW roundel logos

M Compound Brakes W/Black Calipers

Icon Adaptive LED Headlights W/Laserlight

Mechanical

M Carbon Ceramic Brakes

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers
Package

Executive Package

Remote engine start; Heated steering wheel; Power trunk open/close; Head-up display, which projects images of select travel information, such as vehicle speed and navigation instructions, in front of the driver in a visual field that is beyond the windshield; Gesture control

M Driver's Package

This is a 1-day high performance driving class created specifically for BMW M vehicles. The class includes hands-on performance driving training in a controlled environment. The vehicle's top speed limiter will be increased as well.

Driving Assistance Professional Package

Extended Traffic Jam Assistant (for limited access highways), which is a partially automated driving support function; Active Driving Assistant Pro (Active Cruise Control with stop and go functions, Active Lane Keeping Assistant with side collision avoidance, Steering and Traffic Jam Assistant, Automatic Lane Change, Evasion Assistant and Cross-traffic Alert for the front of the car)

Parking Assistance Package

Parking Assistant Plus, which, when engaged, surveys the size of available nearby parallel and perpendicular parking spaces to determine which ones are of adequate size for the M4. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will maneuver the car into that space.
Available Vehicle Colors
Interior

Kyalami Orange/Black Full Merino

Fjord Blue/Black Full Merino

Fiona Red/Black Full Merino

Fjord Blue/Black Extended Merino

Yas Marina Blue/Black Extended Merino W/Yellow Accent

Ivory White Extended Merino

Ivory White Full Merino

Fiona Red/Black Extended Merino

Tartufo Extended Merino

Black Extended Merino

Silverstone/Black Full Merino

Black Full Merino

Silverstone/Black Extended Merino

Tartufo Full Merino

Kyalami Orange/Black Extended Merino

Yas Marina Blue/Black Full Merino W/Yellow Accent

Exterior

Brooklyn Grey Metallic

Sao Paulo Yellow

Aventurin Red Metallic

Tanzanite Blue II Metallic

Black Sapphire Metallic

Isle Of Man Green Metallic

Toronto Red Metallic

Portimao Blue Metallic

(Ind) Dravit Grey Metallic

Alpine White

Frozen Portimao Blue Metallic

Frozen Brilliant White Metallic

Skyscraper Grey Metallic

Interior Trim

Carbon Fiber

Individual Open-Pored Black W/Silver Effect

Individual Aluminum

Individual Piano Black Finish

Aluminum Tetragon

Lot description
It's not a secret for anyone, there are some interesting car auctions in the USA. In this case, the Copart auto auction sold a 2023 BMW M4 with a 3L engine. The auto was sold with several damages which you can see in the photos. To make everything clear we post the VIN Code number of the car WBS43AZ05PCM16256. Selection a vehicle from the Copart auction site is a very profitable choice, because you can win an auto for 42% of its price, thereby save your money if you wish. This car is a good example of a similar solution, because after professional repairs you can drive a good car at a reduced price. If you plan to buy amazing car from the USA or Canada some times you can think about to make an analysis of the best options and understand for what price they are sold and in what condition. You can do this with convenience on our website, because there few companies who provide such information so easy and free with no any payments. You can use the search for a car by vincode number on the website, as well as select a specific make and model to accurately check for the car you need. Today we will tell you how to choose amazing car from a Impact Canadian Auto Auction. For best research, you need to look vehicle photos rigth conscientiously and assess the damage to the car. Read the car info, classification of damage, car odometer and compare them with the vehicle images. Pay attention to the car paint, the condition of the roof, marks from the auction staff and the general condition of the car. If vehicle has a lot of damage then we recommend that you contact the experts so that they evaluate the problems and say you the real estimated cost and time of car repair. We propose that you choose vehicles with small damage resulting from minor accidents or weather conditions, as in this case your car will be as safe after repair as before.