Bidinfo APP

BMW M4 2023 Green Automatic 3 L WBS33BA04PCL96336

WBS33BA04PCL96336 Photo# 1 WBS33BA04PCL96336 Photo# 2 WBS33BA04PCL96336 Photo# 3 WBS33BA04PCL96336 Photo# 4 WBS33BA04PCL96336 Photo# 5 WBS33BA04PCL96336 Photo# 6 WBS33BA04PCL96336 Photo# 7 WBS33BA04PCL96336 Photo# 8 WBS33BA04PCL96336 Photo# 9 WBS33BA04PCL96336 Photo# 10 WBS33BA04PCL96336 Photo# 11 WBS33BA04PCL96336 Photo# 12
Last bid: $ 22 500
Are you an owner?
  • Auction: Copart Auto Auction Copart Auto Auction
  • Lot Number: 80160115
  • Prebid: 22 500 $
  • Date Sale: 15.10.2025
  • Status: Sold
  • Date Updated: 17.10.2025
  • VIN:

    WBS33BA04PCL96336

  • Year: 2023
  • Mileage: 20 257 km
  • Transmission: Automatic
  • Color: Green
  • Primary Damage: Front
  • Secondary Damage: Side
  • Drive: All Wheel Drive
  • Fuel: Gasoline
  • Sale type: Pure Sale
  • Documents: VA - ST
  • Keys Present: No
  • Cylinders: 6
  • Trim: COMPETITION
  • Grid/Row: J050
  • Retail Price: 70998
Engine Information
Compression ratio: 9.3 kg/cm2
Number of cylinders: 6
Displacement: 2993 cc
Configuration: Inline
Horsepower: 503 HP
Torque: 479
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 23 mpg
City: 16 mpg

The BMW M4: A High-Performance Sports Car


If you are a car enthusiast looking for a high-performance sports car, the BMW M4 should definitely be on your list of considerations. With its sleek design, powerful engine, and dynamic handling, this car is sure to impress even the most discerning driver.

Design

The BMW M4 has a low, wide stance that gives it an aggressive and athletic look. The car's long hood and short overhangs create a muscular appearance, while its sharp lines and bold curves convey a sense of speed and agility.

The interior of the BMW M4 is just as impressive as its exterior. The driver-focused cockpit is designed to provide a comfortable and engaging driving experience, with high-quality materials and intuitive controls. The car also features a spacious and well-appointed cabin, complete with premium amenities like heated and ventilated leather seats, a panoramic sunroof, and a premium sound system.

Performance

Under the hood, the BMW M4 is powered by a turbocharged 3.0-liter inline-six engine that delivers an impressive 473 horsepower and 406 lb-ft of torque. This engine provides the M4 with quick acceleration, brisk performance, and a top speed of 155 mph.

The BMW M4 also features a number of performance-enhancing technologies, including an adaptive suspension system that adjusts to your driving style and the road conditions, as well as a high-performance braking system that provides confident stopping power. Additionally, the car is available with a number of driving modes, including a sport mode that sharpens throttle response, transmission tuning, and suspension firmness, and a comfort mode that provides a more relaxed driving experience.

Conclusion

In conclusion, the BMW M4 is a truly exceptional sports car that combines sleek design, powerful performance, and dynamic handling in a single, attractive package. Whether you are looking for a weekend toy or a daily driver, the BMW M4 is definitely worth considering. So if you are in the market for a high-performance sports car, be sure to check out the BMW M4.

Available Vehicle Options
Interior

Neck Warmer

An air vent located at the base of each front seat headrest with adjustable heated air flow settings

M Carbon Bucket Seats

Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats

M Drive Professional

Intended specifically for use in a controlled environment, such as a car racing track, M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.

Drive Recorder

Front Ventilated Seats

Wireless Charging

Wireless charging tray in the center console
Exterior

M Compound Brakes W/Black Calipers

19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Orbit Grey alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Icon Adaptive LED Headlights W/Laserlight

M Compound Brakes W/Red Calipers

19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Black painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

M Shadowline Lights

Black inlay trim within the headlight assemblies

M Carbon Exterior Package

Inlays in the front air intakes and rear diffuser; M Carbon exterior mirror caps

BMW IPerformance Design Elements Deletion

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Bi-Color alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Standard Emblems

Replaces the standard equipment "50 Years of M" logos with the conventional BMW roundel logos
Mechanical

M Carbon Ceramic Brakes

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers
Package

Driving Assistance Professional Package

Extended Traffic Jam Assistant (for limited access highways), which is a partially automated driving support function; Active Driving Assistant Pro (Active Cruise Control with stop and go functions, Active Lane Keeping Assistant with side collision avoidance, Steering and Traffic Jam Assistant, Automatic Lane Change, Evasion Assistant and Cross-traffic Alert for the front of the car)

M Driver's Package

This is a 1-day high performance driving class created specifically for BMW M vehicles. The class includes hands-on performance driving training in a controlled environment. The vehicle's top speed limiter will be increased as well.

Executive Package

Remote engine start; Heated steering wheel; Head-up display, which projects images of select travel information, such as vehicle speed and navigation instructions, in front of the driver in a visual field that is beyond the windshield; Gesture control

Parking Assistance Package

Parking Assistant Plus, which, when engaged, surveys the size of available nearby parallel and perpendicular parking spaces to determine which ones are of adequate size for the M4. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will maneuver the car into that space.
Available Vehicle Colors
Interior

Tartufo Full Merino

Yas Marina Blue/Black Extended Merino W/Yellow Accent

Silverstone/Black Full Merino

Black Extended Merino

Fjord Blue/Black Extended Merino

Kyalami Orange/Black Extended Merino

Ivory White Full Merino

Fjord Blue/Black Full Merino

Tartufo Extended Merino

Kyalami Orange/Black Full Merino

Fiona Red/Black Full Merino

Silverstone/Black Extended Merino

Black Full Merino

Ivory White Extended Merino

Yas Marina Blue/Black Full Merino W/Yellow Accent

Fiona Red/Black Extended Merino

Exterior

Isle Of Man Green Metallic

Black Sapphire Metallic

(Ind) Dravit Grey Metallic

Alpine White

Brooklyn Grey Metallic

Frozen Portimao Blue Metallic

Skyscraper Grey Metallic

Toronto Red Metallic

Aventurin Red Metallic

Portimao Blue Metallic

Frozen Brilliant White Metallic

Tanzanite Blue II Metallic

Sao Paulo Yellow

Roof

Moonlight Black

Black

Interior Trim

Individual Piano Black Finish

Individual Open-Pored Black W/Silver Effect

Aluminum Tetragon

Individual Aluminum

Carbon Fiber

Lot description
As a lot of people know, there are some popular vehicle auctions in the United States of America. Recently the Copart car auction put up for sale 2023 BMW M4 with a 3L engine. The car was sold with several damages which you can see in the photos. In order for the information to be open we published the VIN Code number of the car WBS33BA04PCL96336. Selection a car from the Copart auto auction site is a very profitable investment, because you can win a car for 47% of its price, thereby save your money and take good car if you wish. This car is a nice example of such a case, because after professional repairs you can drive a nice car at a great price. If you need to buy amazing car from the USA, usually you first need to make an analysis of the available options and check for what price they are sold and in what condition. You can do this with convenience on our website, because we are one of the few who publish free data so easy and useful without hide payments. You may use the search for a car by VIN number on the website, as well as select a specific make and model to accurately check for the vehicle you need. Today I want to say you how to choose the nice sedan at the Copart Auto Auction. For best research, you need to examine the car images very carefully and assess the damage to the car. Read the car info, classification of damage, car mileage and compare them with the vehicle photos. Check the paintwork, the condition of the roof, marks from the Insurance Auto Auction staff and the general condition of the vehicle. If it has a lot of damage then we recommend that you contact the experts so that they evaluate the damage and tell you the real estimated cost and time of auto repair. We suggest that you choose vehicles with small problems resulting from minor accidents or weather conditions, as in this case your car will be amazing.