Bidinfo APP

BMW M4 2025 Blue Automatic 3 L WBS33HK02SCS65268

WBS33HK02SCS65268 Photo# 1 WBS33HK02SCS65268 Photo# 2 WBS33HK02SCS65268 Photo# 3 WBS33HK02SCS65268 Photo# 4 WBS33HK02SCS65268 Photo# 5 WBS33HK02SCS65268 Photo# 6 WBS33HK02SCS65268 Photo# 7 WBS33HK02SCS65268 Photo# 8 WBS33HK02SCS65268 Photo# 9 WBS33HK02SCS65268 Photo# 10 WBS33HK02SCS65268 Photo# 11 WBS33HK02SCS65268 Photo# 12 WBS33HK02SCS65268 Photo# 13
Winning bid: $ 43 250
Buy now price: $ 46 750
Are you an owner?
  • Auction: Copart Auto Auction Copart Auto Auction
  • Lot Number: 87657685
  • Winning bid: 43 250 $
  • Prebid: 35 500 $
  • Buy Now Price: 46 750 $
  • Date Sale: 25.02.2025
  • Status: Sold
  • Date Updated: 23.02.2025
  • VIN:

    WBS33HK02SCS65268

  • Year: 2025
  • Condition: Cannot Start
  • Mileage: 4 742 km
  • Transmission: Automatic
  • Color: Blue
  • Primary Damage: Front
  • Drive: All Wheel Drive
  • Fuel: Gasoline
  • Sale type: On Approval
  • Documents: TN - SC
  • Keys Present: No
  • Cylinders: 6
  • Trim: COMPETITION
  • Grid/Row: SC009
  • Retail Price: 98086
Engine Information
Number of cylinders: 6
Displacement: 2993 cc
Configuration: Inline
Horsepower: 523 HP
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger

Sales statistics


The BMW M4: A High-Performance Sports Car


If you are a car enthusiast looking for a high-performance sports car, the BMW M4 should definitely be on your list of considerations. With its sleek design, powerful engine, and dynamic handling, this car is sure to impress even the most discerning driver.

Design

The BMW M4 has a low, wide stance that gives it an aggressive and athletic look. The car's long hood and short overhangs create a muscular appearance, while its sharp lines and bold curves convey a sense of speed and agility.

The interior of the BMW M4 is just as impressive as its exterior. The driver-focused cockpit is designed to provide a comfortable and engaging driving experience, with high-quality materials and intuitive controls. The car also features a spacious and well-appointed cabin, complete with premium amenities like heated and ventilated leather seats, a panoramic sunroof, and a premium sound system.

Performance

Under the hood, the BMW M4 is powered by a turbocharged 3.0-liter inline-six engine that delivers an impressive 473 horsepower and 406 lb-ft of torque. This engine provides the M4 with quick acceleration, brisk performance, and a top speed of 155 mph.

The BMW M4 also features a number of performance-enhancing technologies, including an adaptive suspension system that adjusts to your driving style and the road conditions, as well as a high-performance braking system that provides confident stopping power. Additionally, the car is available with a number of driving modes, including a sport mode that sharpens throttle response, transmission tuning, and suspension firmness, and a comfort mode that provides a more relaxed driving experience.

Conclusion

In conclusion, the BMW M4 is a truly exceptional sports car that combines sleek design, powerful performance, and dynamic handling in a single, attractive package. Whether you are looking for a weekend toy or a daily driver, the BMW M4 is definitely worth considering. So if you are in the market for a high-performance sports car, be sure to check out the BMW M4.

Available Vehicle Options
Interior

M Carbon Bucket Seats

Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats

Individual High-Gloss Black M Graphic Trim

M design graphics in High-gloss Black on the hood and trunk lid.

Individual High-Gloss Red M Graphic Trim

M design graphics in High-gloss Red for the hood and trunk lid.

M Alcantara Steering Wheel

Carbon Package

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers; M Alcantara steering wheel; Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats; Carbon Fiber interior trim; 1-day high performance driving class created specifically for BMW M vehicles. The class includes hands-on performance driving training in a controlled environment. The vehicle's top speed limiter will be increased as well; M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.

Drive Recorder

SensaTec Dashboard

SensaTec (leatherette) covered dashboard

Front Ventilated Seats

Galvanic Controls

Electroplating application on the window, side mirror position, and door lock/unlock buttons.

M Drive Professional

Intended specifically for use in a controlled environment, such as an auto racing track, M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.
Exterior

M Shadowline Lights

Black inlay trim within the headlight assemblies

19"/20" M Double-Spoke Black Forged Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Black painted forged alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Moonroof

Power glass moonroof with 1-touch tilt/slide function; Wind deflector that deploys when the moonroof is slid open; The remainder of the roof is body colored metal, replacing the standard equipment Dark Grey carbon fiber reinforced plastic (CFRP) roof.

M Carbon Exterior Package

Inlays in the front air intakes and rear diffuser; M Carbon exterior mirror caps; M Carbon rear spoiler

M Compound Brakes W/Black Calipers

M Compound Brakes W/Red Calipers

19"/20" M Double-Spoke Silver Forged Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Silver painted forged alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

BMW IPerformance Design Elements Deletion

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Bi-Color painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires
Mechanical

M Carbon Ceramic Brakes

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers
Package

M Driver's Package

This is a 1-day high performance driving class created specifically for BMW M vehicles. The class includes hands-on performance driving training in a controlled environment. The vehicle's top speed limiter will be increased as well.

Parking Assistance Package

Parking Assistant Plus, which, when engaged, surveys the size of available nearby parallel and perpendicular parking spaces to determine which ones are of adequate size for the M4. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will maneuver the car into that space, while requiring the driver to apply braking and acceleration as needed.

Executive Package

Remote engine start; Heated steering wheel; Power trunk open/close; BMW Curved Display with head-up display

Driving Assistance Professional Package

Extended Traffic Jam Assistant (for limited access highways), which is a partially automated driving support function; Active Driving Assistant Pro (Active Cruise Control with stop and go functions, Active Lane Keeping Assistant with side collision avoidance, Steering and Traffic Jam Assistant, Automatic Lane Change, Evasion Assistant and Cross-traffic Alert for the front of the car)
Available Vehicle Colors
Interior

Fiona Red/Black Extended Merino

Yas Marina Blue/Black Full Merino W/Yellow Accent

Fjord Blue/Black Full Merino

Fjord Blue/Black Extended Merino

Ivory White Extended Merino

Kyalami Orange/Black Full Merino

Black Full Merino

Yas Marina Blue/Black Extended Merino W/Yellow Accent

Silverstone/Black Extended Merino

Tartufo Extended Merino

Ivory White Full Merino

Kyalami Orange/Black Extended Merino

Tartufo Full Merino

Silverstone/Black Full Merino

Black Extended Merino

Fiona Red/Black Full Merino

Exterior

Special Order Color

Sao Paulo Yellow

Portimao Blue Metallic

Alpine White

Aventurin Red Metallic

Black Sapphire Metallic

Dravit Grey Metallic

Toronto Red Metallic

Frozen Brilliant White Metallic

Tanzanite Blue II Metallic

Frozen Portimao Blue Metallic

Skyscraper Grey Metallic

Brooklyn Grey Metallic

Isle Of Man Green Metallic

Interior Trim

Aluminum Rhombicle Anthracite

M Fine Brushed Aluminum

Carbon Fiber

Lot description
It's not a secret for anyone, there are some interesting vehicle auctions in the North America. Not so long ago the Copart car auction sold a 2025 BMW M4 with a 3L engine. The car was up for sale with several damages which you can see in the photos. For nothing to be hidden we published the VIN Code number of the car WBS33HK02SCS65268. Selection an auto from the Copart auto auction site is a very profitable choice, because you can win a car for 47% of its price, thereby saving on the acquisition and making a money on it if you wish. This car is a excellent example of a similar solution, because after minor repairs you can drive a nice car at a great price. If you want to buy a good car from United States of America usually you first need to make an analysis of the available options and check for what price they are sold and in what condition. You can check it at this website because there few companies who give full info in the most convenient and simple way with no any payments. You can use the search for a car by VIN number on the site, as well as select a specific make and model to accurately search for the car you need. Today we will tell you hot to find the good auto at the Insurance Auto Auction. For best selection, you need to see vehicle images rigth thoroughly and assess the damage to the car. Read the lot notes, type of damage, car miles and compare them with the car images. Pay attention to the car paint, the condition of the roof, marks from the auction staff and the general condition of the car. If vehicle has a lot of damage then we recommend that you contact the mechanic so that they evaluate the damage and say you the real estimated cost and time of car repair. We suggest that you choose vehicles with small damage resulting from minor accidents or weather conditions, as in this case your auto will be amazing.