BMW M4 2023 Blue Automatic 3 L WBS33AZ03PCM17210
-
Auction:
Copart Auto Auction
- Lot Number: 93276805
- Winning bid: 34 750 $
- Prebid: 29 750 $
- Date Sale: 22.01.2026
- Status: Sold
- Date Updated: 22.01.2026
-
VIN:
WBS33AZ03PCM17210
- Year: 2023
- Condition: Run & Drive Verified
- Mileage: 35 398 km
- Transmission: Automatic
- Color: Blue
- Primary Damage: Front
- Secondary Damage: Side
- Drive: Rear Wheel Drive
- Fuel: Gasoline
- Sale type: On Minimum Bid
- Documents: CA - SC
- Keys Present: No
- Cylinders: 6
- Trim: COMPETITION
- Grid/Row: SI007
- Retail Price: 69970
The BMW M4: A High-Performance Sports Car
If you are a car enthusiast looking for a high-performance sports car, the BMW M4 should definitely be on your list of considerations. With its sleek design, powerful engine, and dynamic handling, this car is sure to impress even the most discerning driver.
Design
The BMW M4 has a low, wide stance that gives it an aggressive and athletic look. The car's long hood and short overhangs create a muscular appearance, while its sharp lines and bold curves convey a sense of speed and agility.
The interior of the BMW M4 is just as impressive as its exterior. The driver-focused cockpit is designed to provide a comfortable and engaging driving experience, with high-quality materials and intuitive controls. The car also features a spacious and well-appointed cabin, complete with premium amenities like heated and ventilated leather seats, a panoramic sunroof, and a premium sound system.
Performance
Under the hood, the BMW M4 is powered by a turbocharged 3.0-liter inline-six engine that delivers an impressive 473 horsepower and 406 lb-ft of torque. This engine provides the M4 with quick acceleration, brisk performance, and a top speed of 155 mph.
The BMW M4 also features a number of performance-enhancing technologies, including an adaptive suspension system that adjusts to your driving style and the road conditions, as well as a high-performance braking system that provides confident stopping power. Additionally, the car is available with a number of driving modes, including a sport mode that sharpens throttle response, transmission tuning, and suspension firmness, and a comfort mode that provides a more relaxed driving experience.
Conclusion
In conclusion, the BMW M4 is a truly exceptional sports car that combines sleek design, powerful performance, and dynamic handling in a single, attractive package. Whether you are looking for a weekend toy or a daily driver, the BMW M4 is definitely worth considering. So if you are in the market for a high-performance sports car, be sure to check out the BMW M4.
Wireless Charging
M Drive Professional
M Carbon Bucket Seats
Front Ventilated Seats
Drive Recorder
M Carbon Exterior Package
M Shadowline Lights
Icon Adaptive LED Headlights W/Laserlight
Standard Emblems
19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires
Moonroof
19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires
M Compound Brakes W/Red Calipers
M Compound Brakes W/Black Calipers
BMW IPerformance Design Elements Deletion
19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires
M Carbon Ceramic Brakes
Parking Assistance Package
M Driver's Package
Executive Package
Driving Assistance Professional Package
Kyalami Orange/Black Full Merino
Silverstone/Black Full Merino
Ivory White Extended Merino
Fiona Red/Black Extended Merino
Fiona Red/Black Full Merino
Fjord Blue/Black Extended Merino
Kyalami Orange/Black Extended Merino
Black Extended Merino
Tartufo Extended Merino
Tartufo Full Merino
Silverstone/Black Extended Merino
Black Full Merino
Yas Marina Blue/Black Extended Merino W/Yellow Accent
Fjord Blue/Black Full Merino
Yas Marina Blue/Black Full Merino W/Yellow Accent
Ivory White Full Merino
(Ind) Dravit Grey Metallic
Aventurin Red Metallic
Isle Of Man Green Metallic
Skyscraper Grey Metallic
Brooklyn Grey Metallic
Sao Paulo Yellow
Portimao Blue Metallic
Toronto Red Metallic
Tanzanite Blue II Metallic
Frozen Brilliant White Metallic
Frozen Portimao Blue Metallic
Black Sapphire Metallic
Alpine White
Individual Open-Pored Black W/Silver Effect
Aluminum Tetragon
Carbon Fiber
Individual Piano Black Finish
Individual Aluminum