Bidinfo APP

BMW M4 2024 White Automatic 3 L WBS43AZ06RCP22708

WBS43AZ06RCP22708 Photo# 1 WBS43AZ06RCP22708 Photo# 2 WBS43AZ06RCP22708 Photo# 3 WBS43AZ06RCP22708 Photo# 4 WBS43AZ06RCP22708 Photo# 5 WBS43AZ06RCP22708 Photo# 6 WBS43AZ06RCP22708 Photo# 7 WBS43AZ06RCP22708 Photo# 8 WBS43AZ06RCP22708 Photo# 9 WBS43AZ06RCP22708 Photo# 10 WBS43AZ06RCP22708 Photo# 11 WBS43AZ06RCP22708 Photo# 12 WBS43AZ06RCP22708 Photo# 13 WBS43AZ06RCP22708 Photo# 14 WBS43AZ06RCP22708 Photo# 15 WBS43AZ06RCP22708 Photo# 16
Winning bid: $ 30 125
Buy now price: $ 37 500
Are you an owner?
  • Auction: IAAI Auction IAA Auction
  • Lot Number: 39118615
  • Winning bid: 30 125 $
  • Buy Now Price: 37 500 $
  • Date Sale: 24.06.2024
  • Status: Sold
  • Date Updated: 18.06.2024
  • VIN:

    WBS43AZ06RCP22708

  • Year: 2024
  • Condition: Vehicle Starts
  • Mileage: 43 880 km
  • Transmission: Automatic
  • Body: Coupe
  • Color: White
  • Primary Damage: Front
  • Secondary Damage: Left Side
  • Drive: All Wheel Drive
  • Fuel: Automatic
  • Sale type: On Minimum Bid
  • Airbag State: Deployed
  • Seller: State Farm Group Insurance
  • Cylinders: 6
  • Loss Type: Collision
  • Actual Odometer: Yes
  • Keys: Yes
  • Actual Cash Value: $ 91 849
Engine Information
Compression ratio: 9.3 kg/cm2
Number of cylinders: 6
Displacement: 2993 cc
Configuration: Inline
Horsepower: 503 HP
Torque: 479
Valves: 24
Code: 6ITTG3.0
Compressor Type: twin turbocharger
Highway: 22 mpg
City: 16 mpg

The BMW M4: A High-Performance Sports Car


If you are a car enthusiast looking for a high-performance sports car, the BMW M4 should definitely be on your list of considerations. With its sleek design, powerful engine, and dynamic handling, this car is sure to impress even the most discerning driver.

Design

The BMW M4 has a low, wide stance that gives it an aggressive and athletic look. The car's long hood and short overhangs create a muscular appearance, while its sharp lines and bold curves convey a sense of speed and agility.

The interior of the BMW M4 is just as impressive as its exterior. The driver-focused cockpit is designed to provide a comfortable and engaging driving experience, with high-quality materials and intuitive controls. The car also features a spacious and well-appointed cabin, complete with premium amenities like heated and ventilated leather seats, a panoramic sunroof, and a premium sound system.

Performance

Under the hood, the BMW M4 is powered by a turbocharged 3.0-liter inline-six engine that delivers an impressive 473 horsepower and 406 lb-ft of torque. This engine provides the M4 with quick acceleration, brisk performance, and a top speed of 155 mph.

The BMW M4 also features a number of performance-enhancing technologies, including an adaptive suspension system that adjusts to your driving style and the road conditions, as well as a high-performance braking system that provides confident stopping power. Additionally, the car is available with a number of driving modes, including a sport mode that sharpens throttle response, transmission tuning, and suspension firmness, and a comfort mode that provides a more relaxed driving experience.

Conclusion

In conclusion, the BMW M4 is a truly exceptional sports car that combines sleek design, powerful performance, and dynamic handling in a single, attractive package. Whether you are looking for a weekend toy or a daily driver, the BMW M4 is definitely worth considering. So if you are in the market for a high-performance sports car, be sure to check out the BMW M4.

Available Vehicle Options
Interior

Front Ventilated Seats

M Carbon Bucket Seats

Front seats with carbon fiber reinforced plastic (CFRP) seatbacks; Cut-outs in the front seat side bolsters and just below the integrated headrests of those seats

M Drive Professional

Intended specifically for use in a controlled environment, such as an auto racing track, M Drive Professional measures and records a variety of track driving maneuvers for analysis to help drivers improve their on-track driving performance. The information can be shown on the control display (screen) on the top, center of the dashboard.; M Drift Analyzer, which records various aspects of a drift, such as duration, distance covered, line and angle, then assigns a star rating to that drift.; M Laptimer, which is used to record the duration of each lap around a race course, and can be referenced for comparative analysis.

Drive Recorder

SensaTec Dashboard

Exterior

19"/20" M Double-Spoke Orbit Grey Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Orbit Grey painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

Moonroof

Power glass moonroof with 1-touch tilt/slide function; Wind deflector that deploys when the moonroof is slid open; The remainder of the roof is body colored metal, replacing the standard equipment Dark Grey carbon fiber reinforced plastic (CFRP) roof.

BMW IPerformance Design Elements Deletion

Icon Adaptive LED Headlights W/Laserlight

M Compound Brakes W/Red Calipers

19"/20" M Double-Spoke Black Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 826M) Black painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires

19" x 9.5" front and 20" x 10.5" rear M Double-Spoke (style 825M) Bi-Color painted alloy wheels with 275/35R19 front and 285/30R20 rear non run-flat performance tires

M Carbon Exterior Package

Inlays in the front air intakes and rear diffuser; M Carbon exterior mirror caps; M Carbon rear spoiler

M Shadowline Lights

Black inlay trim within the headlight assemblies

M Compound Brakes W/Black Calipers

Mechanical

M Carbon Ceramic Brakes

16" carbon ceramic front brake rotors with Gold painted calipers; 15" rear brake rotors with Gold painted calipers
Package

Parking Assistance Package

Parking Assistant Plus, which, when engaged, surveys the size of available nearby parallel and perpendicular parking spaces to determine which ones are of adequate size for the M4. When a space of adequate size is found by Parking Assistant and selected by the driver, this feature will maneuver the car into that space, while requiring the driver to apply braking and acceleration as needed.

Executive Package

Remote engine start; Heated steering wheel; Power trunk open/close; BMW Curved Display with head-up display

Driving Assistance Professional Package

Extended Traffic Jam Assistant (for limited access highways), which is a partially automated driving support function; Active Driving Assistant Pro (Active Cruise Control with stop and go functions, Active Lane Keeping Assistant with side collision avoidance, Steering and Traffic Jam Assistant, Automatic Lane Change, Evasion Assistant and Cross-traffic Alert for the front of the car)
Available Vehicle Colors
Interior

Fiona Red/Black Extended Merino

Yas Marina Blue/Black Full Merino W/Yellow Accent

Ivory White Extended Merino

Fjord Blue/Black Full Merino

Silverstone/Black Extended Merino

Ivory White Full Merino

Fiona Red/Black Full Merino

Tartufo Extended Merino

Yas Marina Blue/Black Extended Merino W/Yellow Accent

Kyalami Orange/Black Full Merino

Black Full Merino

Silverstone/Black Full Merino

Fjord Blue/Black Extended Merino

Kyalami Orange/Black Extended Merino

Tartufo Full Merino

Black Extended Merino

Exterior

Frozen Portimao Blue Metallic

Skyscraper Grey Metallic

Dravit Grey Metallic

Sao Paulo Yellow

Tanzanite Blue II Metallic

Alpine White

Brooklyn Grey Metallic

Black Sapphire Metallic

Isle Of Man Green Metallic

Aventurin Red Metallic

Frozen Brilliant White Metallic

Toronto Red Metallic

Portimao Blue Metallic

Interior Trim

Carbon Fiber

Individual Aluminum

Aluminum Rhrombicle Anthracite

Individual Piano Black Finish

Lot description
It has already become popular and everyone knows, there are some popular auto auctions in the North America. In this case, the Iaai car auction put up for sale 2024 BMW M4 with a 3L engine. The auto was up for sale with several damages which you can see in the photos. To show everything clear we post the vincode of the car WBS43AZ06RCP22708. Buying an auto from the Iaai auto auction site is a very profitable choice, because you can buy a vehicle for 44% of its price, thereby save your money and take good car if you wish. This car is a good example of a similar solution, because after normal repairs you can drive a good car at a reduced price. If you need to buy a nice car from United States of America then most likely you first need to make an analysis of the available options and check for what price they are sold and in what condition. You can check it at this website because there few companies who give full information so easy and useful with no any payments. You may use the search for a car by VIN number on the website, as well as select a specific make and model to accurately check for the vehicle you need. Today I think it’s good to say you ahot to analyze the good auto from a Copart Auto Auction. For best research, you need to look auto vincode images rigth carefully and assess the damage to the car. Read the annotation, category of damage, car mileage and compare them with the vehicle photos. Look at the paintwork, the condition of the roof, marks from the Insurance Auto Auction staff and the general condition of the vehicle. If it has a lot of damage then we suggest that you contact the professional so that they evaluate the problems and tell you the real estimated price of auto repair. We propose that you choose car with minimal problems resulting from minor accidents or weather conditions, as in this case your car will be amazing.