Bidinfo APP

BMW M4 2025 Green Mechanical 3 L WBS13HK08SCU73825

WBS13HK08SCU73825 Photo# 1 WBS13HK08SCU73825 Photo# 2 WBS13HK08SCU73825 Photo# 3 WBS13HK08SCU73825 Photo# 4 WBS13HK08SCU73825 Photo# 5 WBS13HK08SCU73825 Photo# 6 WBS13HK08SCU73825 Photo# 7 WBS13HK08SCU73825 Photo# 8 WBS13HK08SCU73825 Photo# 9 WBS13HK08SCU73825 Photo# 10 WBS13HK08SCU73825 Photo# 11 WBS13HK08SCU73825 Photo# 12 WBS13HK08SCU73825 Photo# 13 WBS13HK08SCU73825 Photo# 14 WBS13HK08SCU73825 Photo# 15 WBS13HK08SCU73825 Photo# 16 WBS13HK08SCU73825 Photo# 17
Winning bid: $ 29 450
Buy now price: $ 35 000
Are you an owner?
  • Auction: IAAI Auction IAA Auction
  • Lot Number: 43817100
  • Winning bid: 29 450 $
  • Buy Now Price: 35 000 $
  • Price Repair: 40 913 $
  • Date Sale: 26.01.2026
  • Status: Sold
  • Date Updated: 19.01.2026
  • VIN:

    WBS13HK08SCU73825

  • Year: 2025
  • Condition: Run & Drive Verified
  • Mileage: 8 291 km
  • Transmission: Mechanical
  • Body: Coupe
  • Color: Green
  • Primary Damage: Front
  • Estimated Repair Cost: $ 40 913
  • Drive: Rear Wheel Drive
  • Fuel: Gasoline
  • Sale type: On Minimum Bid
  • Airbag State: Intact
  • Cylinders: 6
  • Loss Type: Collision
  • Actual Odometer: Yes
  • Keys: Yes
  • Actual Cash Value: $ 77 511

The BMW M4: A High-Performance Sports Car


If you are a car enthusiast looking for a high-performance sports car, the BMW M4 should definitely be on your list of considerations. With its sleek design, powerful engine, and dynamic handling, this car is sure to impress even the most discerning driver.

Design

The BMW M4 has a low, wide stance that gives it an aggressive and athletic look. The car's long hood and short overhangs create a muscular appearance, while its sharp lines and bold curves convey a sense of speed and agility.

The interior of the BMW M4 is just as impressive as its exterior. The driver-focused cockpit is designed to provide a comfortable and engaging driving experience, with high-quality materials and intuitive controls. The car also features a spacious and well-appointed cabin, complete with premium amenities like heated and ventilated leather seats, a panoramic sunroof, and a premium sound system.

Performance

Under the hood, the BMW M4 is powered by a turbocharged 3.0-liter inline-six engine that delivers an impressive 473 horsepower and 406 lb-ft of torque. This engine provides the M4 with quick acceleration, brisk performance, and a top speed of 155 mph.

The BMW M4 also features a number of performance-enhancing technologies, including an adaptive suspension system that adjusts to your driving style and the road conditions, as well as a high-performance braking system that provides confident stopping power. Additionally, the car is available with a number of driving modes, including a sport mode that sharpens throttle response, transmission tuning, and suspension firmness, and a comfort mode that provides a more relaxed driving experience.

Conclusion

In conclusion, the BMW M4 is a truly exceptional sports car that combines sleek design, powerful performance, and dynamic handling in a single, attractive package. Whether you are looking for a weekend toy or a daily driver, the BMW M4 is definitely worth considering. So if you are in the market for a high-performance sports car, be sure to check out the BMW M4.

Lot description
It's not a secret for anyone, there are many used and new auto auctions in the United States of America. Not so long ago the Iaai auto auction sold a 2025 BMW M4 with a 3L engine. The car was up for sale with minor damage which can check in the photos. To show everything clear we post the VIN Code number of the car WBS13HK08SCU73825. Selection an auto from the Iaai auction site is a very profitable choice, because you can win a car for 47% of its price, thereby save your capital and making good decision if you want. This car is a excellent example of a similar solution, because after professional repairs you can drive a good car at a reduced price. If you plan to buy a good car from the USA or Canada usually you first need to make an analysis of the available options and understand for what price they are sold and in what condition. You can do this with convenience on our website, because we are one of the few who publish free data so easy and free with no any payments. You can use the search for a car by VIN number on the website, as well as select a specific make and model to accurately check for the vehicle you need. Today I think it’s good to say you hot to find the good car at the IAAI Auto Auction. For start, it’s better to look vehicle images very attentively and assess the damage to the car. Read the car info, form of damage, car miles and compare them with the vehicle images. Check the paintwork, the condition of the roof, marks from the Copart staff and the general condition of the vehicle. If car has a lot of damage then we recommend that you contact the experts so that they check the problems and inform you the real estimated cost and time of vehicle repair. We recommend that you choose vehicles with little problems resulting from minor accidents or weather conditions, as in this case your vehicle will be as safe after repair as before.