BMW M4 2018 Black Automatic 3 L WBS4Y9C54JAA85325
-
Auction:
IAA Auction
- Lot Number: 45938613
- Winning bid: 17 350 $
- Date Sale: 24.09.2026
- Status: Sold
- Date Updated: 09.10.2026
-
VIN:
WBS4Y9C54JAA85325
- Year: 2018
- Condition: Vehicle Starts
- Mileage: 106 092 km
- Transmission: Automatic
- Body: Coupe
- Color: Black
- Primary Damage: Front
- Drive: Rear Wheel Drive
- Fuel: Gasoline
- Sale type: On Minimum Bid
- Airbag State: Intact
- Cylinders: 6
- Loss Type: Collision
- Actual Odometer: Yes
- Keys: Yes
- Actual Cash Value: $ 36 024
The BMW M4: A High-Performance Sports Car
If you are a car enthusiast looking for a high-performance sports car, the BMW M4 should definitely be on your list of considerations. With its sleek design, powerful engine, and dynamic handling, this car is sure to impress even the most discerning driver.
Design
The BMW M4 has a low, wide stance that gives it an aggressive and athletic look. The car's long hood and short overhangs create a muscular appearance, while its sharp lines and bold curves convey a sense of speed and agility.
The interior of the BMW M4 is just as impressive as its exterior. The driver-focused cockpit is designed to provide a comfortable and engaging driving experience, with high-quality materials and intuitive controls. The car also features a spacious and well-appointed cabin, complete with premium amenities like heated and ventilated leather seats, a panoramic sunroof, and a premium sound system.
Performance
Under the hood, the BMW M4 is powered by a turbocharged 3.0-liter inline-six engine that delivers an impressive 473 horsepower and 406 lb-ft of torque. This engine provides the M4 with quick acceleration, brisk performance, and a top speed of 155 mph.
The BMW M4 also features a number of performance-enhancing technologies, including an adaptive suspension system that adjusts to your driving style and the road conditions, as well as a high-performance braking system that provides confident stopping power. Additionally, the car is available with a number of driving modes, including a sport mode that sharpens throttle response, transmission tuning, and suspension firmness, and a comfort mode that provides a more relaxed driving experience.
Conclusion
In conclusion, the BMW M4 is a truly exceptional sports car that combines sleek design, powerful performance, and dynamic handling in a single, attractive package. Whether you are looking for a weekend toy or a daily driver, the BMW M4 is definitely worth considering. So if you are in the market for a high-performance sports car, be sure to check out the BMW M4.
Power Rear Sunshade
Merino Leather Dashboard
Apple CarPlay Compatibility
Head-Up Display
Heated Steering Wheel
Wireless Charging
20" M Forged Star-Spoke Wheels W/Mixed Performance Tires
Moonroof
19" M Forged Double-Spoke Wheels W/Mixed Performance Tires
20" M Forged Black Star-Spoke Wheels W/Mixed Performance Tires
19" M Forged Black Double-Spoke Wheels W/Mixed Performance Tires
Active Driving Assistant
Standard Suspension
M Carbon Ceramic Brakes
M Double-Clutch Transmission W/Drivelogic
M Driver's Package
Executive Package
Competition Package
Active Blind Spot Detection
Park Distance Control
Sonoma Beige Full Merino
Sakhir Orange/Black Full Merino
Black Extended Merino
Amaro Brown Extended Merino (Individual)
Silverstone Full Merino
Sakhir Orange/Black Extended Merino
Golden Brown Extended Merino (Individual)
Combination Carbonstructure Anthracite/Black
Silverstone Extended Merino
Black Full Merino
Opal White Extended Merino (Individual)
Sonoma Beige Extended Merino
Cohiba Brown/Black Extended Merino (Individual)
Nutmeg Extended Merino (Individual)
Sakhir Orange II Metallic
Silverstone Metallic
Smoked Topaz Metallic
Black Sapphire Metallic
Champagne Quartz Metallic
Mineral Grey Metallic
Yas Marina Blue Metallic
Azurite Black Metallic
Austin Yellow Metallic
Mineral White Metallic
Alpine White
Tanzanite Blue Metallic
Fineline Anthracite W/Pearl Gloss Chrome Highlight
Piano Finish Black
Dark Red Sycamore
Aluminum Blade W/Black Chrome Highlight
White Ash Grain
Carbon Fiber W/Black Chrome Highlight