Bidinfo APP

BMW M5 2021 Gray Automatic 4.4 L WBS83CH05MCF77820

WBS83CH05MCF77820 Photo# 1 WBS83CH05MCF77820 Photo# 2 WBS83CH05MCF77820 Photo# 3 WBS83CH05MCF77820 Photo# 4 WBS83CH05MCF77820 Photo# 5 WBS83CH05MCF77820 Photo# 6 WBS83CH05MCF77820 Photo# 7 WBS83CH05MCF77820 Photo# 8 WBS83CH05MCF77820 Photo# 9 WBS83CH05MCF77820 Photo# 10 WBS83CH05MCF77820 Photo# 11 WBS83CH05MCF77820 Photo# 12
Winning bid: $ 49 000
Are you an owner?
  • Auction: Copart Auto Auction Copart Auto Auction
  • Lot Number: 94064215
  • Winning bid: 49 000 $
  • Prebid: 40 750 $
  • Date Sale: 14.01.2026
  • Status: Sold
  • Date Updated: 14.01.2026
  • VIN:

    WBS83CH05MCF77820

  • Year: 2021
  • Condition: Cannot Start
  • Mileage: 30 367 km
  • Transmission: Automatic
  • Color: Gray
  • Primary Damage: Side
  • Secondary Damage: Rear
  • Drive: All Wheel Drive
  • Fuel: Gasoline
  • Sale type: Pure Sale
  • Documents: FL - RB
  • Keys Present: No
  • Cylinders: 8
  • Grid/Row: GG140
  • Retail Price: 83500
Engine Information
Compression ratio: 10 kg/cm2
Number of cylinders: 8
Displacement: 4395 cc
Configuration: V
Horsepower: 600 HP
Torque: 553
Valves: 32
Code: 8VTTG4.4
Compressor Type: twin turbocharger
Highway: 21 mpg
City: 15 mpg

BMW M5: The Ultimate Driving Machine


The BMW M5 is a high-performance luxury car that has been in production since 1985. Over the years, it has established a reputation for being a well-rounded vehicle that delivers thrilling performance, luxury, and comfort all in one package. The latest iteration of the M5, the G30 generation, was introduced in 2017 and has only further cemented the M5's position as a top player in the luxury sports sedan segment.

Performance

The BMW M5 is powered by a 4.4-liter V8 engine that produces 600 horsepower and 553 lb-ft of torque. This engine is paired with an 8-speed automatic transmission and all-wheel drive, making it capable of accelerating from 0 to 60 mph in just 3.2 seconds. The M5 also features an M xDrive system, which provides a rear-wheel-drive feel with the added grip of all-wheel drive. The car's performance is further enhanced by its M Sport suspension, which provides sharp handling and improved grip, making the M5 a joy to drive on both the street and the track.

Luxury and Comfort

The BMW M5 is not only a performance machine, but it also offers a high level of luxury and comfort. The interior is filled with premium materials, such as leather and real wood accents, and the front seats are heated and cooled for ultimate comfort. The car also features a host of advanced technology, including a 12.3-inch digital instrument cluster, a 10.25-inch infotainment system, and a 16-speaker Harman Kardon sound system. Additionally, the M5 offers a spacious and comfortable interior, with plenty of room for both front and rear passengers, making it an ideal choice for long road trips.

Exterior Design

The BMW M5 has a bold and aggressive exterior design that sets it apart from the standard 5 Series models. The car features a large grille, sporty front and rear bumpers, and quad exhaust tips, all of which give the M5 a distinctive look that is sure to turn heads. The M5 is also available with a range of exterior color options, including bold and bright hues, as well as more understated tones, allowing drivers to choose a color that best suits their personal style.

Conclusion

The BMW M5 is a high-performance luxury car that is perfect for drivers who want the best of both worlds. The car delivers thrilling performance and handling, combined with a luxurious and comfortable interior, making it an excellent choice for those who want a car that can do it all. If you're in the market for a high-performance luxury car, the BMW M5 should definitely be on your list of cars to consider.

Available Vehicle Options
Interior

Bowers & Wilkins Diamond Surround Sound System

Bowers & Wilkins 1400-watt surround sound audio system with 16 speakers, 10 amplification channels, QuantumLogic Surround/Dynamic Sound equalizing via measuring microphone and three analog crossover networks
Exterior

20" M Double-Spoke Black Wheels

20" x 9.5" front and 20" x 10.5" rear M Double-Spoke (Style 706M) Black alloy wheels with 275/35R20 front and 285/35R20 rear performance tires

20" M Double-Spoke Bi-Color Wheels

20" x 9.5" front and 20" x 10.5" rear M Double-Spoke (Style 810M) Bi-Color alloy wheels with 275/35R20 front and 285/35R20 rear performance tires

M Carbon Ceramic Brakes

Moonroof

Mechanical

M Compound Brakes W/Black Calipers

M Compound Brakes W/Red Calipers

Package

Driver Assistance Plus

Active Driving Assistant Plus, which includes Active Cruise Control w/Stop & Go, Active Lane Keeping Assistant with side collision avoidance, Traffic Jam Assistant, Evasion Aid and Cross-traffic alert front

Executive Package

Soft-close automatic doors; Power rear sunshade with rear manual side window shades; Front ventilated seats; Heated rear seats; Front massaging seats; Parking Assistant Plus; Drive Recorder; Active Park Distance Control; Surround view w/3D view

Competition Package

M Sport exhaust system with additional 17 horsepower; 20" x 9.5" front and 20" x 10.5" rear forged M Y-Spoke (Style 789M) bi-color alloy wheels with 275/35R20 front and 285/35R20 rear performance tires; Individual Shadowline lights; M Seat Belts; Extended Shadowline Trim with black chrome tailpipes and extended black high-gloss design elements; Lowered sport suspension

M Driver's Package

This is a 1-day high performance driving class created specifically for BMW M vehicles. The class includes performance driving training on a racetrack and is available at the BMW Performance Center East (South Carolina) and West (California).
Available Vehicle Colors
Interior

Smoke White/Black Full Merino (Individual)

Black Full Merino W/Midrand Beige

Silverstone Full Merino

Aragon Brown Full Merino

Tartufo Full Merino (Individual)

Black Full Merino

Aragon Brown Extended Merino

Silverstone Extended Merino

Black Extended Merino

Exterior

Motegi Red Metallic

Frozen Bluestone Metallic

Bluestone Metallic

Marina Bay Blue Metallic

Snapper Rocks Blue Metallic

Alvite Grey Metallic

Donington Grey Metallic

Alpine White

Tanzanite Blue II Metallic

(Ind) Aventurin Red Metallic

Black Sapphire Metallic

Brands Hatch Grey Metallic

Interior Trim

Fineline Ridge Wood

Aluminum Dark Carbon Structure

(Ind) Plum Brown Wood

Aluminum Carbon Structure

Individual Piano Black Finish

Lot description
As people know, that there are a couple vehicle auctions in the North America. Recently the Copart car auction put up for sale 2021 BMW M5 with a 4.4L engine. The auto was up for sale with minor damage which can check in the photos. For nothing to be hidden we post the vincode of the car WBS83CH05MCF77820. Selection a car from the Copart auto auction site is a very profitable choice, because you can buy a car for 40% of its price, thereby save your money if you wish. This car is a excellent example of a similar solution, because after normal repairs you can drive a good car at a reduced price. If you think to buy a good vehicle from the USA, some times you first need to make an analysis of the nice options and check for what price they are sold and in what condition. You can check it at this website because we are one of the few who give full info in the most convenient and simple way without hide payments. You may use the search for a car by vincode number on the website, as well as select a specific make and model to accurately check for the vehicle you need. Today I think it’s good to say you hot to find amazing auto at the Copart. For best selection, it’s better to examine auto vincode photos very thoroughly and assess the damage to the car. Read the car info, classification of damage, car odometer and compare them with the lot images. Check the car paint, the condition of the roof, marks from the Insurance Auto Auction staff and the general condition of the vehicle. If car has a lot of damage then we recommend that you contact the mechanic so that they evaluate the problems and show you the real estimated price of auto repair. We suggest that you choose car with small problems resulting from minor accidents or weather conditions, as in this case your vehicle will be good.