BMW M5 2022 Gray Automatic 4.4 L WBS83CH07NCK66677
-
Auction:
IAA Auction
- Lot Number: 41425835
- Winning bid: 23 675 $
- Price Repair: 51 763 $
- Date Sale: 25.03.2025
- Status: Sold
- Date Updated: 28.03.2025
-
VIN:
WBS83CH07NCK66677
- Year: 2022
- Condition: Vehicle Starts
- Mileage: 32 429 km
- Transmission: Automatic
- Body: Sedan
- Color: Gray
- Primary Damage: All Over
- Secondary Damage:
- Estimated Repair Cost: $ 51 763
- Drive: All Wheel Drive
- Fuel: Automatic
- Sale type: On Minimum Bid
- Airbag State: Deployed
- Seller: Geico Insurance
- Cylinders: 8
- Loss Type: Collision
- Actual Odometer: Yes
- Keys: Yes
- Actual Cash Value: $ 82 227
BMW M5: The Ultimate Driving Machine
The BMW M5 is a high-performance luxury car that has been in production since 1985. Over the years, it has established a reputation for being a well-rounded vehicle that delivers thrilling performance, luxury, and comfort all in one package. The latest iteration of the M5, the G30 generation, was introduced in 2017 and has only further cemented the M5's position as a top player in the luxury sports sedan segment.
Performance
The BMW M5 is powered by a 4.4-liter V8 engine that produces 600 horsepower and 553 lb-ft of torque. This engine is paired with an 8-speed automatic transmission and all-wheel drive, making it capable of accelerating from 0 to 60 mph in just 3.2 seconds. The M5 also features an M xDrive system, which provides a rear-wheel-drive feel with the added grip of all-wheel drive. The car's performance is further enhanced by its M Sport suspension, which provides sharp handling and improved grip, making the M5 a joy to drive on both the street and the track.
Luxury and Comfort
The BMW M5 is not only a performance machine, but it also offers a high level of luxury and comfort. The interior is filled with premium materials, such as leather and real wood accents, and the front seats are heated and cooled for ultimate comfort. The car also features a host of advanced technology, including a 12.3-inch digital instrument cluster, a 10.25-inch infotainment system, and a 16-speaker Harman Kardon sound system. Additionally, the M5 offers a spacious and comfortable interior, with plenty of room for both front and rear passengers, making it an ideal choice for long road trips.
Exterior Design
The BMW M5 has a bold and aggressive exterior design that sets it apart from the standard 5 Series models. The car features a large grille, sporty front and rear bumpers, and quad exhaust tips, all of which give the M5 a distinctive look that is sure to turn heads. The M5 is also available with a range of exterior color options, including bold and bright hues, as well as more understated tones, allowing drivers to choose a color that best suits their personal style.
Conclusion
The BMW M5 is a high-performance luxury car that is perfect for drivers who want the best of both worlds. The car delivers thrilling performance and handling, combined with a luxurious and comfortable interior, making it an excellent choice for those who want a car that can do it all. If you're in the market for a high-performance luxury car, the BMW M5 should definitely be on your list of cars to consider.
Bowers & Wilkins Diamond Surround Sound System
20" M Double-Spoke Bi-Color Wheels
M Carbon Ceramic Brakes
20" M Double-Spoke Black Wheels
Standard Emblems
Moonroof
M Compound Brakes W/Red Calipers
M Compound Brakes W/Black Calipers
M Driver's Package
Competition Package
Driver Assistance Professional Package
Executive Package
Silverstone Full Merino
Tartufo Full Merino (Individual)
Aragon Brown Extended Merino
Black Extended Merino
Black Full Merino
Black Full Merino W/Midrand Beige
Smoke White/Black Full Merino (Individual)
Aragon Brown Full Merino
Silverstone Extended Merino
Frozen Bluestone Metallic
Snapper Rocks Blue Metallic
Brands Hatch Grey Metallic
Alvite Grey Metallic
Dark Graphite Metallic
Donington Grey Metallic
Black Sapphire Metallic
BMW Individual Aventurin Red Metallic
Marina Bay Blue Metallic
Tanzanite Blue II Metallic
Alpine White
Motegi Red Metallic
Bluestone Metallic
(Ind) Plum Brown Wood
Aluminum Carbon Structure
Fineline Ridge Wood
Individual Piano Black Finish
Aluminum Dark Carbon Structure