BMW M3 2025 Чёрный Автоматическая 3 л WBS33HJ04SFT86576
-
Аукцион:
Copart Auto Auction
- Номер лота: 64006535
- Ставка: 32 250 $
- Дата продажи: 08.09.2025
- Статус: Продан
- Дата обновления: 08.09.2025
-
VIN:
WBS33HJ04SFT86576
- Год: 2025
- Состояние: Не заводится
- Пробег: 5 978 км
- Трансмиссия: Автоматическая
- Цвет: Чёрный
- Первичные повреждения: Боковая часть
- Вторичные повреждения: Передняя часть
- Привод: Полный привод
- Топливо: Бензин
- Тип продажи: Чистая продажа
- Документы: IN - BP
- Наличие ключей: No
- Цилиндры: 6
- Комплектация: COMPETITION
- Grid/Row: B230
- Розничная цена: 94814
The BMW M3: A High-Performance Sports Sedan
The BMW M3 is a legendary sports sedan that has been synonymous with performance and luxury for over three decades. It's a car that has been designed for driving enthusiasts who demand the best of both worlds: speed and comfort. Whether you're navigating winding roads or cruising on the highway, the BMW M3 provides an unforgettable driving experience that is both exhilarating and refined.
Exterior Design
The BMW M3 exudes a sense of power and presence, with its wide stance, aggressive lines, and muscular proportions. From the front, the kidney grille and sharp LED headlights create a menacing look, while the flared fenders and distinctive side skirts give the car an athletic appearance. The car's aerodynamic bodywork includes air vents, a rear spoiler, and a diffuser, all of which work together to create downforce and improve stability at high speeds. The BMW M3 also comes with 19-inch or 20-inch alloy wheels, which further enhance its aggressive styling.
Interior Comfort and Technology
The interior of the BMW M3 is a luxurious and comfortable place to be, with premium materials and advanced technologies. The car's sport seats are ergonomically designed to provide excellent support and comfort, even during hard driving. The dashboard is clean and modern, with a large infotainment screen that controls the car's advanced navigation, entertainment, and connectivity systems. The BMW M3 also comes with a premium sound system, wireless charging, and a full-color head-up display that projects information onto the windshield for easy viewing. In addition, the car's climate control system ensures that you always feel comfortable, no matter the weather outside.
Performance and Handling
Under the hood, the BMW M3 is powered by a 3.0-liter turbocharged inline-six engine that produces up to 503 horsepower and 479 lb-ft of torque. This engine is mated to an eight-speed automatic transmission that provides quick and smooth shifting. The BMW M3 also comes with a number of advanced technologies that enhance its performance and handling, including an electronically controlled limited-slip differential, active suspension, and an M-specific all-wheel-drive system. The result is a car that delivers lightning-fast acceleration, excellent handling, and unparalleled driving dynamics.
In conclusion, the BMW M3 is a high-performance sports sedan that is unrivaled in its class. With its powerful engine, advanced technology, and luxurious interior, the BMW M3 is a car that delivers an unforgettable driving experience that combines speed, comfort, and style. Whether you're a driving enthusiast or just someone who appreciates luxury, the BMW M3 is a car that is well worth considering.