BMW M4 2025 Серый Автоматическая 3 л WBS43BA03SCT59162
-
Аукцион:
IAA Auction
- Номер лота: 45917734
- Price Repair: 44 185 $
- Дата продажи: 19.10.2026
- Статус: Предстоящий
- Дата обновления: 11.10.2026
-
VIN:
WBS43BA03SCT59162
- Год: 2025
- Состояние: Заводится
- Пробег: 22 628 км
- Трансмиссия: Автоматическая
- Кузов: Кабриолет
- Цвет: Серый
- Первичные повреждения: Левая часть
- Estimated Repair Cost: $ 44 185
- Привод: Полный привод
- Топливо: Бензин
- Тип продажи: Минимальная ставка
- Состояние подушек: Deployed
- Цилиндры: 6
- Тип убытка: Collision
- Актуальный пробег: Yes
- Ключи: Yes
- Акутальная розничная цена: $ 83 963
The BMW M4: A High-Performance Sports Car
If you are a car enthusiast looking for a high-performance sports car, the BMW M4 should definitely be on your list of considerations. With its sleek design, powerful engine, and dynamic handling, this car is sure to impress even the most discerning driver.
Design
The BMW M4 has a low, wide stance that gives it an aggressive and athletic look. The car's long hood and short overhangs create a muscular appearance, while its sharp lines and bold curves convey a sense of speed and agility.
The interior of the BMW M4 is just as impressive as its exterior. The driver-focused cockpit is designed to provide a comfortable and engaging driving experience, with high-quality materials and intuitive controls. The car also features a spacious and well-appointed cabin, complete with premium amenities like heated and ventilated leather seats, a panoramic sunroof, and a premium sound system.
Performance
Under the hood, the BMW M4 is powered by a turbocharged 3.0-liter inline-six engine that delivers an impressive 473 horsepower and 406 lb-ft of torque. This engine provides the M4 with quick acceleration, brisk performance, and a top speed of 155 mph.
The BMW M4 also features a number of performance-enhancing technologies, including an adaptive suspension system that adjusts to your driving style and the road conditions, as well as a high-performance braking system that provides confident stopping power. Additionally, the car is available with a number of driving modes, including a sport mode that sharpens throttle response, transmission tuning, and suspension firmness, and a comfort mode that provides a more relaxed driving experience.
Conclusion
In conclusion, the BMW M4 is a truly exceptional sports car that combines sleek design, powerful performance, and dynamic handling in a single, attractive package. Whether you are looking for a weekend toy or a daily driver, the BMW M4 is definitely worth considering. So if you are in the market for a high-performance sports car, be sure to check out the BMW M4.
M Alcantara Steering Wheel
Carbon Package
M Carbon Bucket Seats
Galvanic Controls
SensaTec Dashboard
Drive Recorder
Front Ventilated Seats
M Drive Professional
Neck Warmer
M Carbon Exterior Package
BMW IPerformance Design Elements Deletion
M Shadowline Lights
M Compound Brakes W/Red Calipers
M Compound Brakes W/Black Calipers
19"/20" M Double-Spoke Bi-Color Wheels W/Performance Non Run-Flat Tires
19"/20" M Double-Spoke Black Forged Wheels W/Performance Non Run-Flat Tires
19"/20" M Double-Spoke Silver Forged Wheels W/Performance Non Run-Flat Tires
M Carbon Ceramic Brakes
Executive Package
M Driver's Package
Driving Assistance Professional Package
Parking Assistance Package
Fiona Red/Black Full Merino
Yas Marina Blue/Black Extended Merino W/Yellow Accent
Silverstone/Black Extended Merino
Fjord Blue/Black Extended Merino
Kyalami Orange/Black Full Merino
Tartufo Extended Merino
Black Full Merino
Silverstone/Black Full Merino
Tartufo Full Merino
Fjord Blue/Black Full Merino
Kyalami Orange/Black Extended Merino
Fiona Red/Black Extended Merino
Ivory White Extended Merino
Yas Marina Blue/Black Full Merino W/Yellow Accent
Ivory White Full Merino
Black Extended Merino
Portimao Blue Metallic
Toronto Red Metallic
Brooklyn Grey Metallic
Alpine White
Skyscraper Grey Metallic
Sao Paulo Yellow
Tanzanite Blue II Metallic
Isle Of Man Green Metallic
Frozen Brilliant White Metallic
Frozen Portimao Blue Metallic
Dravit Grey Metallic
Special Order Color
Aventurin Red Metallic
Black Sapphire Metallic
Black
Moonlight Black
Carbon Fiber
Aluminum Rhombicle Anthracite
M Fine Brushed Aluminum